Rivian Adventure Network RAN Charging Stations

A

108

Total Sites

191

Average Peak Power (kW)

23.1%

Open To All (25 sites)

RAN Open Access Progress Rivian Adventure Network Open Access Progress

Rivian is gradually opening Adventure Network (RAN) chargers to all electric vehicles. This tracker shows the percentage of Rivian Adventure Network stations that support charging for non-Rivian EVs with tap-to-pay credit card payment.

Open to All 23.1% (25)

Site Reliability Distribution

A 106
B 2
C 0
D 0
F 0

RAN Charging Locations Rivian Adventure Network Charging Locations

Showing 108 of 108 sites

Name Location Max Power Avg Peak Reliability Amenities Added ↓
Astoria, OR Astoria, OR 300 kW 177 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 March 07, 2025
Columbus, TX Columbus, TX 300 kW 196 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 March 06, 2025
Springfield, IL Springfield, IL 300 kW 196 kW A Open 🍽️ 🚻 February 08, 2025
Chipley, FL Chipley, FL 300 kW 203 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 January 17, 2025
Cisco, TX Cisco, TX 300 kW 206 kW A Open 🍽️ 🚻 December 21, 2024
Flagler, CO Flagler, CO 300 kW 206 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 December 21, 2024
Placerville, CA Placerville, CA 300 kW 192 kW A – β˜•οΈ 🍽️ December 21, 2024
Normal, IL Normal, IL 300 kW 197 kW A Open β˜•οΈ 🍽️ πŸ›οΈ December 20, 2024
Gardiner, MT Gardiner, MT 300 kW 181 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 December 20, 2024
Erie, PA Erie, PA 300 kW 195 kW A Open β˜•οΈ 🍽️ December 18, 2024
Bozeman, MT Bozeman, MT 300 kW 172 kW A Open β˜•οΈ 🍽️ December 18, 2024
Queensbury, NY Queensbury, NY 300 kW 191 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 December 13, 2024
Del Norte, CO Del Norte, CO 300 kW 192 kW A Open πŸ›οΈ December 11, 2024
Lansing, MI Lansing, MI 300 kW 194 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 December 10, 2024
Fredericksburg, VA Fredericksburg, VA 300 kW 199 kW A – β˜•οΈ 🍽️ December 06, 2024
Shoshone, CA Shoshone, CA 300 kW 201 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 December 05, 2024
Joshua Tree, CA Joshua Tree, CA 300 kW 190 kW A Open πŸ›οΈ December 03, 2024
Lynnwood, WA Lynnwood, WA 300 kW 180 kW A – β˜•οΈ 🍽️ November 26, 2024
Dallas, TX Dallas , TX 300 kW 186 kW A – β˜•οΈ 🍽️ 🚻 November 24, 2024
San Bernardino, CA San Bernardino, CA 300 kW 188 kW A – β˜•οΈ 🍽️ 🚻 October 28, 2024
Lake Charles, LA Lake Charles , LA 300 kW 198 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 October 04, 2024
Walker, MI Walker, MI 300 kW 190 kW A – β˜•οΈ 🍽️ 🚻 September 06, 2024
Burley, ID Burley, ID 300 kW 204 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 July 20, 2024
Groveland, CA Issue Groveland, CA 300 kW 166 kW A – β˜•οΈ 🍽️ πŸ›οΈ July 20, 2024
Freeport, ME Freeport, ME 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ July 19, 2024
Kittery, ME Kittery, ME 300 kW 182 kW A – β˜•οΈ 🍽️ 🚻 July 19, 2024
Phoenix, AZ Phoenix, AZ 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ July 18, 2024
Moosic, PA Moosic, PA 300 kW 193 kW A – β˜•οΈ 🍽️ June 21, 2024
Sun Prairie, WI Sun Prairie, WI 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 June 21, 2024
Sacramento, CA Sacramento, CA 300 kW 179 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 June 19, 2024
Lee Vining, CA Lee Vining, CA 300 kW 193 kW A – 🍽️ 🚻 June 19, 2024
East Greenwich, RI East Greenwich, RI 300 kW 179 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 June 13, 2024
West Lebanon, NH West Lebanon, NH 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Brattleboro, VT Brattleboro, VT 300 kW 191 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Holyoke, MA Holyoke, MA 300 kW 191 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Newburgh, NY Newburgh, NY 300 kW 190 kW A – β˜•οΈ 🍽️ 🚻 –
Newark, DE Newark, DE 300 kW 193 kW A – β˜•οΈ 🍽️ –
Daytona Beach, FL Daytona Beach, FL 300 kW 203 kW A – β˜•οΈ 🍽️ –
Belcamp, MD Belcamp, MD 300 kW 192 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
US-RIV-L5734501248498362119 Henderson, NC 300 kW 193 kW A Open β˜•οΈ 🍽️ 🚻 –
Hagerstown, MD Hagerstown, MD 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Breezewood, PA Breezewood, PA 300 kW 190 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Front Royal, VA Front Royal, VA 300 kW 201 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
US-RIV-L6161725981375120230 Pooler, GA 300 kW 206 kW A Open 🍽️ πŸ›οΈ 🚻 –
US-RIV-L6131509295739167154 Waynesboro, VA 300 kW 197 kW A Open 🍽️ 🚻 –
Roanoke, VA Roanoke, VA 300 kW 191 kW A – β˜•οΈ 🍽️ 🚻 –
Meadows of Dan, VA Issue Meadows of Dan, VA 300 kW 192 kW A – β˜•οΈ 🍽️ 🚻 –
US-RIV-L2797438283583649266 Charlotte, NC 300 kW 197 kW A Open β˜•οΈ 🍽️ –
US-RIV-L16632393921841581148 Augusta, GA 300 kW 197 kW A Open β˜•οΈ 🍽️ 🚻 –
US-RIV-L7132609490195715167 Blowing Rock, NC 300 kW 184 kW A Open 🍽️ πŸ›οΈ 🚻 –
US-RIV-L7953531635816439930 Greenville, SC 300 kW 205 kW A Open β˜•οΈ 🍽️ πŸ›οΈ –
Strongsville, OH Strongsville, OH 300 kW 195 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Mackinaw City, MI Mackinaw City, MI 300 kW 197 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
US-RIV-L451425707649488557 Macon, GA 300 kW 198 kW A Open 🍽️ –
US-RIV-L4126083133598127782 Whittier, NC 300 kW 195 kW A Open β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Maumee, OH Maumee, OH 300 kW 191 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Saginaw, MI Saginaw, MI 300 kW 196 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Clare, MI Clare, MI 300 kW 207 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Grayling, MI Grayling, MI 300 kW 210 kW B – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Traverse City, MI Traverse City, MI 300 kW 178 kW A – β˜•οΈ 🍽️ –
US-RIV-L8384578670029334531 Cookeville, TN 300 kW 200 kW A Open β˜•οΈ 🍽️ –
US-RIV-L13160365438350136805 Atlanta, GA 300 kW 180 kW A Open β˜•οΈ 🍽️ πŸ›οΈ –
Granger, IN Granger, IN 300 kW 193 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Benton Harbor, MI Benton Harbor, MI 300 kW 190 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Slidell, LA Slidell, LA 300 kW 193 kW A – β˜•οΈ 🍽️ –
Baton Rouge, LA Baton Rouge, LA 300 kW 193 kW B – β˜•οΈ 🍽️ –
Columbia, MO Columbia, MO 300 kW 198 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Centerville, TX Centerville, TX 300 kW 201 kW A – 🍽️ πŸ›οΈ 🚻 –
Wichita, KS Wichita, KS 300 kW 195 kW A – β˜•οΈ 🍽️ –
Hays, KS Hays, KS 300 kW 184 kW A – 🍽️ πŸ›οΈ 🚻 –
San Antonio, TX San Antonio, TX 300 kW 193 kW A – β˜•οΈ 🍽️ –
Cheyenne, WY Cheyenne, WY 300 kW 183 kW A – 🍽️ πŸ›οΈ –
Salida, CO Salida, CO 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Broomfield, CO Broomfield, CO 300 kW 169 kW A – β˜•οΈ 🍽️ –
Montrose, CO Montrose, CO 300 kW 183 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Grand Junction, CO Grand Junction, CO 300 kW 191 kW A – β˜•οΈ 🍽️ –
Holbrook, AZ Holbrook, AZ 300 kW 197 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Flagstaff, AZ Flagstaff, AZ 300 kW 189 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Sedona, AZ Sedona, AZ 300 kW 192 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Gila Bend, AZ Gila Bend, AZ 300 kW 203 kW A – 🍽️ πŸ›οΈ 🚻 –
Kingman, AZ Kingman, AZ 300 kW 199 kW A – β˜•οΈ 🍽️ 🚻 –
Quartzsite, AZ Quartzsite, AZ 300 kW 194 kW A – 🍽️ πŸ›οΈ 🚻 –
Spokane, WA Spokane Valley, WA 300 kW 189 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Las Vegas, NV Las Vegas, NV 300 kW 187 kW A – β˜•οΈ 🍽️ –
Barstow, CA Barstow, CA 300 kW 192 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Bishop, CA Bishop, CA 300 kW 182 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Inyokern, CA Inyokern, CA 300 kW 196 kW A – 🍽️ πŸ›οΈ 🚻 –
Olancha, CA Olancha, CA 300 kW 186 kW A – 🚻 –
Klamath Falls, OR Klamath Falls, OR 300 kW 191 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Crescent, OR Crescent, OR 300 kW 195 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Madras, OR Madras, OR 300 kW 197 kW A – 🍽️ 🚻 –
Buttonwillow, CA Buttonwillow, CA 300 kW 195 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Truckee, CA Truckee, CA 300 kW 170 kW A – 🍽️ 🚻 –
The Dalles, OR The Dalles, OR 300 kW 197 kW A – β˜•οΈ 🍽️ 🚻 –
Mount Shasta, CA Mount Shasta, CA 300 kW 188 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Firebaugh, CA Firebaugh, CA 300 kW 199 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Santa Nella, CA Santa Nella, CA 300 kW 197 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Manteca, CA Manteca, CA 300 kW 185 kW A – 🍽️ πŸ›οΈ –
Roseburg, OR Roseburg, OR 300 kW 197 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Happy Valley, OR Happy Valley, OR 300 kW 177 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Crescent City, CA Crescent City, CA 300 kW 186 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Ukiah, CA Ukiah, CA 300 kW 195 kW A – β˜•οΈ 🍽️ 🚻 –
Corte Madera, CA Corte Madera, CA 300 kW 171 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Fortuna, CA Fortuna, CA 300 kW 199 kW A – β˜•οΈ 🍽️ 🚻 –
Coos Bay, OR Coos Bay, OR 300 kW 170 kW A – β˜•οΈ 🍽️ πŸ›οΈ –
Lincoln City, OR Lincoln City, OR 300 kW 175 kW A – β˜•οΈ 🍽️ 🚻 –
Aberdeen, WA Aberdeen, WA 300 kW 195 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –
Forks, WA Forks, WA 300 kW 169 kW A – β˜•οΈ 🍽️ πŸ›οΈ 🚻 –

About RAN About Rivian Adventure Network

The Rivian Adventure Network is a growing network of fast DC charging stations designed for Rivian and other electric vehicles. Most stations offer charging speeds up to 191 kW, adding up to 140 miles of range in about 20 minutes.

Rivian is expanding access to RAN charging stations for all EVs with tap-to-pay credit card capability. Currently, 25 stations are open to non-Rivian vehicles.

Reliability rating is calculated based on data from the Rivian vehicle fleet and user reports.

Grade scale: A B C D F

"Open to all" indicates that the charging station can be used by any electric vehicle, not just Rivian vehicles. These Rivian Adventure Network (RAN) stations support tap-to-pay with credit card. As of April 2025, 23.1% of RAN stations are open to non-Rivian EVs.