Network Reliability Report
Updated less than a minute ago
Total Sites
132
Avg Peak Power
197.5 kW
Grade Distribution
Total Sites
58
Avg Peak Power
205.0 kW
Grade Distribution
ChargePoint
B+
Total Sites
27,227
Avg Peak Power
76.6 kW
Grade Distribution
Total Sites
1,706
Avg Peak Power
185.0 kW
Grade Distribution
Total Sites
3,749
Avg Peak Power
124.2 kW
Grade Distribution
EV Connect
B-
Total Sites
2,740
Avg Peak Power
101.7 kW
Grade Distribution
Total Sites
2,165
Avg Peak Power
86.8 kW
Grade Distribution
| Network | Reliability | Sites | Avg Peak Power | Grade Distribution |
|---|---|---|---|---|
| Rivian Adventure Network |
A
|
132 | 197.5 kW |
|
| IONNA |
A
|
30 | 203.5 kW |
|
| FPL EVolution |
A-
|
92 | 124.4 kW |
|
| FLO Network |
B+
|
3,075 | 63.1 kW |
|
| Francis |
B+
|
185 | 115.5 kW |
|
| Mercedes-Benz Charging Network |
B+
|
58 | 205.0 kW |
|
| ChargePoint |
B+
|
27,227 | 76.6 kW |
|
| Tesla |
B+
|
2,664 | 178.9 kW |
|
| BC Hydro |
B
|
126 | 81.3 kW |
|
| Electrify America |
B
|
1,706 | 185.0 kW |
|
| FLO US Network |
B
|
1,024 | 84.3 kW |
|
| EVgo |
B
|
1,276 | 118.5 kW |
|
| Circuit électrique |
B
|
3,749 | 124.2 kW |
|
| Electrify Canada |
B-
|
46 | 158.1 kW |
|
| EV Connect |
B-
|
2,740 | 101.7 kW |
|
| Shell Recharge |
C+
|
2,165 | 86.8 kW |
|
| Petro-Canada |
C+
|
60 | 126.9 kW |
|
Reliability rating is calculated based on data from the Rivian vehicle fleet and user reports.
Grade scale:
A
B
C
D
F