ChargePoint
B+
29,487
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
637 (2%)
B
657 (2%)
C
184 (1%)
D
34 (0%)
F
21 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| STATE OF DE SCC 1 | Georgetown, DE |
|
7 kW | – | – |
|
25 Dec |
| HOTEL LOCATION TOWNPLACE | Rochester, NY |
|
10 kW | – | – |
|
25 Dec |
| RW GENESEO POOL HOUSE 1 | Geneseo, NY |
|
10 kW | – | – |
|
25 Dec |
| COLL BROCKPORT UNION LOTO | Brockport, NY |
|
7 kW | – | – |
|
25 Dec |
| RW GENESEO POOL HOUSE 2 | Geneseo, NY |
|
10 kW | – | – |
|
25 Dec |
| HOTEL LOCATION TOWN PLACE | Rochester, NY |
|
10 kW | – | – |
|
25 Dec |
| LOFTS AT 1117 PARKING LOT | Syracuse, NY |
|
13 kW | – | – |
|
25 Dec |
| COLL BROCKPORT ALLEN LOOP | Brockport, NY |
|
7 kW | – | – |
|
25 Dec |
| PETRO-CANADA 33755-PL | Oakville, ON |
|
200 kW | – | – |
|
25 Dec |
| PUBLICLE EVSE-0 | Pontiac, MI |
|
19 kW | – | – |
|
25 Dec |
| BROADSTREET DUFFERIN | Portage la Prairie, MB |
|
7 kW | – | – |
|
25 Dec |
| ICCU RICH-22-4 | Richland, WA |
|
7 kW | – | – |
|
25 Dec |
| ICCU RICH-22 | Richland, WA |
|
7 kW | – | – |
|
25 Dec |
| DOUBLETREEBOSSB STATION | Boston, MA |
|
7 kW | – | – |
|
25 Dec |
| HIEXPITTSFIELD HIEXPITTSFIELD | Pittsfield, MA |
|
12 kW | – | – |
|
25 Dec |
| MIRAMAR BCH HP STATION | Miramar Beach, FL |
|
8 kW | – | – |
|
25 Dec |
| UCONN WATERBURY ST | Waterbury, CT |
|
7 kW | – | – |
|
24 Dec |
| WAFLEET WATER ED 2 | Healdsburg, CA |
|
12 kW | – | – |
|
24 Dec |
| WAFLEET 800 FLEET | Santa Rosa, CA |
|
12 kW | – | – |
|
24 Dec |
| RAY AT THE WELD | Raleigh, NC |
|
7 kW | – | – |
|
24 Dec |