Mercedes-Benz High-Power Charging
76
Sites
—
Avg kW
Reliability Distribution
Sites
St Johnsbury, VT
400kW max
Beasley, TX
400kW max
Phoenix, OR
400kW max
Braintree, MA
400kW max
Phoenix, OR
400kW max
Coquitlam, BC
400kW max
Tsawwassen, BC
400kW max
Lansing, MI
400kW max
Long Beach , CA
400kW max
Saco, ME
400kW max
Methuen, MA
400kW max
Norfolk, VA
400kW max
Norfolk , VA
400kW max
Alpharetta, GA
400kW max
Terrell, TX
400kW max
Baytown, TX
400kW max
Lee, MA
400kW max
South Windsor , CT
400kW max
Thornton, CO
400kW max
Greensboro, NC
400kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| St Johnsbury MB.HPC (St Johnsbury, VT) | — | 400 | 22 Feb | ||
| Chevron Beasley MB.HPC (Beasley, TX) | — | 400 | 19 Feb | ||
| Starbucks Phoenix MB.HPC (Phoenix, OR) | — | 400 | 19 Feb | ||
| TBD Braintree MB.HPC (Braintree, MA) | — | 400 | 18 Feb | ||
| Phoenix, OR MB,HPC (Phoenix, OR) | — | 400 | 17 Feb | ||
| Sunwood Square MB.HPC (Coquitlam, BC) | — | 400 | 14 Feb | ||
| Tsawwassen Mills MB.HPC (Tsawwassen, BC) | — | 400 | 13 Feb | ||
| Eastwood Towne Center MB.HPC (Lansing, MI) | — | 400 | 13 Feb | ||
| LATC Not For Public HYC-400 (Long Beach , CA) | — | 400 | 06 Feb | ||
| Industrial Park Saco MB.HPC (Saco, ME) | — | 400 | 04 Feb | ||
| TBD Methuen MB.HPC (Methuen, MA) | — | 400 | 04 Feb | ||
| Norfolk Premium Outlets MB.HPC (Norfolk, VA) | — | 400 | 03 Feb | ||
| Norfolk Premium Outlets MB.HPC (Norfolk , VA) | — | 400 | 30 Jan | ||
| Avalon Alpharetta MB.HPC (Alpharetta, GA) | — | 400 | 30 Jan | ||
| Bucees Terrell MB.HPC (Terrell, TX) | — | 400 | 29 Jan | ||
| Bucees Baytown MB.HPC (Baytown, TX) | — | 400 | 29 Jan | ||
| Lee Premium Outlets MB.HPC (Lee, MA) | — | 400 | 29 Jan | ||
| Evergreen Walk MB.HPC (South Windsor , CT) | — | 400 | 29 Jan | ||
| The Grove Thornton MB.HPC (Thornton, CO) | — | 400 | 29 Jan | ||
| Friendly Center Greensboro MB.HPC (Greensboro, NC) | — | 400 | 27 Jan |