ChargePoint
B+
29,063
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
637 (2%)
B
633 (2%)
C
173 (1%)
D
40 (0%)
F
18 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| KEMENY LASKY REC | Detroit, MI |
|
19 kW | – | – |
|
18 Nov |
| CONSUMERSENERGY HOW-EVSE-1 | Howell, MI |
|
4 kW | – | – |
|
18 Nov |
| BEDROCK BEDROCK MIL 3 | Detroit, MI |
|
7 kW | – | – |
|
18 Nov |
| TOC-PKD TEAMONE-CP-001 | Charlotte, MI |
|
19 kW | – | – |
|
18 Nov |
| CLEVEFDN MCC | Cleveland, OH |
|
7 kW | – | – |
|
18 Nov |
| VCPARK VC PARK | Aurora, OH |
|
7 kW | – | – |
|
18 Nov |
| BEDROCK BEDROCK MIL 5 | Detroit, MI |
|
7 kW | – | – |
|
18 Nov |
| WINDSOR REGION. STATION 1 | Windsor, ON |
|
7 kW | – | – |
|
18 Nov |
| SOUTH EUCLID QUARRY PARK S2 | South Euclid, OH |
|
10 kW | – | – |
|
18 Nov |
| MERCY HOSPITAL BELOIT | Beloit, WI |
|
7 kW | – | – |
|
18 Nov |
| PERIM PARK O-LP PERIM PARK O-L | Morrisville, NC |
|
7 kW | – | – |
|
18 Nov |
| LAKE NONA LNC-5 | Orlando, FL |
|
7 kW | – | – |
|
18 Nov |
| A2 PARKS VET'S PARK | Ann Arbor, MI |
|
7 kW | – | – |
|
18 Nov |
| A2 PARKS VET'S PARK 1 | Ann Arbor, MI |
|
7 kW | – | – |
|
18 Nov |
| WASHCOMMCOLLEGE LOT 1 ST2 | Ann Arbor, MI |
|
12 kW | – | – |
|
18 Nov |
| LOCKWOOD MGMT HAVERHILLCLARK | Ypsilanti, MI |
|
7 kW | – | – |
|
18 Nov |
| MB ANN ARBOR 1 POWER LINK | Ann Arbor, MI |
|
156 kW | – | – |
|
18 Nov |
| CITY OF KENT CITY HALL 1 N | Kent, OH |
|
7 kW | – | – |
|
18 Nov |
| AATWP1 ANN ARBOR 1 | Ann Arbor, MI |
|
15 kW | – | – |
|
18 Nov |
| WASHCOMMCOLLEGE LOT 1-ST 1 | Ann Arbor, MI |
|
12 kW | – | – |
|
18 Nov |