ChargePoint
B+23,861
Sites
81
Avg kW
Reliability Distribution
A: 2%
B: 3%
C: 1%
Sites
San Jose, CA
19kW max
Albuquerque, NM
19kW max
Coral Gables, FL
4kW max
Holly Springs, NC
7kW max
Kirkland, WA
7kW max
Westerville, OH
8kW max
Decatur, IL
63kW max
Boca Raton, FL
63kW max
Boca Raton, FL
63kW max
Castro Valley, CA
19kW max
Wytheville, VA
7kW max
Annapolis, MD
7kW max
Decatur, IL
63kW max
Lone Tree, CO
4kW max
Chester, VA
10kW max
Tuskegee, AL
63kW max
Jacksonville, FL
7kW max
San Mateo, CA
7kW max
Novato, CA
120kW max
Boca Raton, FL
19kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| KEPLER HQ STATION (San Jose, CA) | — | 19 | 12 Feb | ||
| CES NM CES MAIN (Albuquerque, NM) | — | 19 | 11 Feb | ||
| 701 VALENCIA CH CHARGER (Coral Gables, FL) | — | 4 | 11 Feb | ||
| KLOOSTER DENTAL KLOOSTER DEN (Holly Springs, NC) | — | 7 | 11 Feb | ||
| KRKLAND HEIGHTS OFFICE 2 (Kirkland, WA) | — | 7 | 11 Feb | ||
| VC ACRES VC ACRES 2 (Westerville, OH) | — | 8 | 11 Feb | ||
| CITY OF DECATUR LIBRARY (Decatur, IL) | — | 63 | 11 Feb | ||
| FERRARI BOCA 1 FERRARI BOCA 1 (Boca Raton, FL) | — | 63 | 11 Feb | ||
| FERRARI BOCA 1 FERRARI BOCA 2 (Boca Raton, FL) | — | 63 | 11 Feb | ||
| CVSAN EV STATION (Castro Valley, CA) | — | 19 | 10 Feb | ||
| BOLLING WILSON GRAZE ON MAIN (Wytheville, VA) | — | 7 | 10 Feb | ||
| MD HOD HOD STATION 7 (Annapolis, MD) | — | 7 | 10 Feb | ||
| CITY OF DECATUR CIVIC CENTER (Decatur, IL) | — | 63 | 10 Feb | ||
| THE LINCOLN APT THE LINCOLN APT (Lone Tree, CO) | — | 4 | 10 Feb | ||
| DUAL HOTEL CHESTNUT HILL (Chester, VA) | — | 10 | 10 Feb | ||
| UBT TUSKEGEE UBT (Tuskegee, AL) | — | 63 | 10 Feb | ||
| DEERWOOD FOREST ST 001 (Jacksonville, FL) | — | 7 | 10 Feb | ||
| SMCCD CSM LOT U-B1 (San Mateo, CA) | — | 7 | 10 Feb | ||
| EVROADWAY VO #8 (Novato, CA) | — | 120 | 10 Feb | ||
| PATCH REEF PARK STATION (Boca Raton, FL) | — | 19 | 10 Feb |