ChargePoint
B+
29,063
Total Sites
79
Avg Peak kW
Site Reliability Distribution
Site uptime and performance grades.
A
637 (2%)
B
633 (2%)
C
173 (1%)
D
40 (0%)
F
18 (0%)
ChargePoint Charging Locations
Site reliability grade
Operational /
Issues
| Name | Location |
Amenities
|
|||||
|---|---|---|---|---|---|---|---|
| WEST BLOOMFIELD WBT | West Bloomfield, MI |
|
13 kW | – | – |
|
18 Nov |
| MOL ATRC | Belle River, ON |
|
10 kW | – | – |
|
18 Nov |
| BWL WALTER-FRENCH 2 | Lansing, MI |
|
7 kW | – | – |
|
18 Nov |
| BWL WALTER-FRENCH 1 | Lansing, MI |
|
7 kW | – | – |
|
18 Nov |
| CRW3 CENTRAL STATION | Willoughby, OH |
|
8 kW | – | – |
|
18 Nov |
| MELROSE PARKING MELROSE LOT | Ambridge, PA |
|
19 kW | – | – |
|
18 Nov |
| WALLED LAKE OPERATIONS | commerce twp, MI |
|
7 kW | – | – |
|
18 Nov |
| CONSUMERSENERGY HOW-EVSE-2 | Howell, MI |
|
4 kW | – | – |
|
18 Nov |
| E BUILDING OABB-D5 | Kirtland, OH |
|
7 kW | – | – |
|
18 Nov |
| PLEASANT HILLS CHIPP SVC DEPT | Beaver Falls, PA |
|
12 kW | – | – |
|
18 Nov |
| CLEVELAND FLEET CANAL BASIN | Cleveland, OH |
|
7 kW | – | – |
|
18 Nov |
| L418 EAST STATION | Plymouth, MI |
|
63 kW | – | – |
|
18 Nov |
| DABAJA CHARGING CHARGER | Canton, MI |
|
200 kW | 147 kW | A |
|
18 Nov |
| MOL LAKEVIEW PARK | Belle River, ON |
|
10 kW | – | – |
|
18 Nov |
| CRW3 CENTRAL STATION 1 | Willoughby, OH |
|
4 kW | – | – |
|
18 Nov |
| E BUILDING STATION 2 | Kirtland, OH |
|
7 kW | – | – |
|
18 Nov |
| WILLIAMS WILLIAMS REC | Detroit, MI |
|
19 kW | – | – |
|
18 Nov |
| HENRYFORDBH AFPQO000000 | West Bloomfield, MI |
|
7 kW | – | – |
|
18 Nov |
| PLEASANT HILLS CHIPP DEL. AREA | Beaver Falls, PA |
|
12 kW | – | – |
|
18 Nov |
| BEDROCK 200 WALKER 1 | Detroit, MI |
|
7 kW | – | – |
|
18 Nov |