City of Industry, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
City of Industry, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
Tempe, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Sanford, FL
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
Aberdeen, MD
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Oxford, PA
193 kW avg peak
500 kW maximum
First tracked Jan 16, 2026
Wichita, KS
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Arden, NC
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Fort Worth, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Liberty Lake, WA
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 16, 2026
Bend, OR
Average peak power unavailable
8 kW maximum
First tracked Jan 15, 2026
Bend, OR
Average peak power unavailable
8 kW maximum
First tracked Jan 15, 2026
Scarborough, ME
Average peak power unavailable
12 kW maximum
First tracked Jan 15, 2026
Wayland, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
Cleveland, OH
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
Bloomington, MN
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
Charleston, SC
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
Charleston, SC
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
Hayward, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 15, 2026
Charleston, SC
Average peak power unavailable
7 kW maximum
First tracked Jan 15, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
AXCA 18138
City of Industry, CA
Operational First tracked Jan 17, 2026 |
Operational | — | 12 kW | Jan 17, 2026 |
|
MIRATEMPE NOVUS ST2
Tempe, AZ
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
HOTEL LEFT O
Sanford, FL
Operational First tracked Jan 17, 2026 |
Operational | — | 12 kW | Jan 17, 2026 |
|
FIELDSIDEGRANDE FG5
Aberdeen, MD
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
LANDHOPE LV3 DC CHARGER
Oxford, PA Reliability B Operational First tracked Jan 16, 2026 |
Operational | 193 kW | 500 kW | Jan 16, 2026 |
|
OVATION APT OVATION
Wichita, KS
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
SCB ARDEN PINES
Arden, NC
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
OBE FW HOUS&LANCSTR
Fort Worth, TX
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
HUB FIELDS STATION
Liberty Lake, WA
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
FLATS ON D STATION
Boston, MA
Operational First tracked Jan 16, 2026 |
Operational | — | 7 kW | Jan 16, 2026 |
|
WESTMAN HOTEL
Bend, OR
Operational First tracked Jan 15, 2026 |
Operational | — | 8 kW | Jan 15, 2026 |
|
WESTMAN HOTEL 4
Bend, OR
Operational First tracked Jan 15, 2026 |
Operational | — | 8 kW | Jan 15, 2026 |
|
1 BRIDGES DRIVE STATION 1
Scarborough, ME
Operational First tracked Jan 15, 2026 |
Operational | — | 12 kW | Jan 15, 2026 |
|
OXBOWWAYLAND OUTSIDE C
Wayland, MA
Operational First tracked Jan 15, 2026 |
Operational | — | 7 kW | Jan 15, 2026 |
|
TRU EV CHARGER TRU1
Cleveland, OH
Operational First tracked Jan 15, 2026 |
Operational | — | 7 kW | Jan 15, 2026 |
|
THE PARKING SPT MSP
Bloomington, MN
Operational First tracked Jan 15, 2026 |
Operational | — | 7 kW | Jan 15, 2026 |
|
GODDARD POINT H STATION 5
Charleston, SC
Operational First tracked Jan 15, 2026 |
Operational | — | 7 kW | Jan 15, 2026 |
|
GODDARD POINT H STATION 2
Charleston, SC
Unknown First tracked Jan 15, 2026 |
Unknown | — | 7 kW | Jan 15, 2026 |
|
1X
Hayward, CA
Unknown First tracked Jan 15, 2026 |
Unknown | — | 12 kW | Jan 15, 2026 |
|
GODDARD POINT H STATION 3
Charleston, SC
Operational First tracked Jan 15, 2026 |
Operational | — | 7 kW | Jan 15, 2026 |