Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Jan 18, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Jan 18, 2026
Hartford, VT
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Schenectady, NY
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Hamilton, ON
Average peak power unavailable
19 kW maximum
First tracked Jan 17, 2026
Seattle, WA
50 kW avg peak
63 kW maximum
First tracked Jan 17, 2026
Troutdale, OR
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
Maupin, OR
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Durham, NH
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Norwood, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Wayland, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Norwood, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Wayland, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Minneapolis, MN
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Klamath, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Orleans, CA
Average peak power unavailable
19 kW maximum
First tracked Jan 17, 2026
Salt Lake City, UT
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Raleigh, NC
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
City of Industry, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
Tempe, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 17, 2026
Sanford, FL
Average peak power unavailable
12 kW maximum
First tracked Jan 17, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CUSTOMERSALES1 SALES2
Vancouver, BC
Operational First tracked Jan 18, 2026 |
Operational | — | 19 kW | Jan 18, 2026 |
|
VERMONT BGS HARTFORD EVSE
Hartford, VT
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
ELMER ELMER 1
Schenectady, NY
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
UJT CHARGING CP6K CHARGER
Hamilton, ON
Operational First tracked Jan 17, 2026 |
Operational | — | 19 kW | Jan 17, 2026 |
|
EVROADWAY WA-PACSCI01
Seattle, WA Reliability D Operational First tracked Jan 17, 2026 |
Operational | 50 kW | 63 kW | Jan 17, 2026 |
|
EDGEWOOD APTS EASTWOOD
Troutdale, OR
Operational First tracked Jan 17, 2026 |
Operational | — | 12 kW | Jan 17, 2026 |
|
MAUPIN MAUPIN
Maupin, OR
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
TOWN OF DURHAM PETTEE ST2
Durham, NH
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
EV STATION AT HAWES POOL
Norwood, MA
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
OXBOWWAYLAND OUTSIDE
Wayland, MA
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
EV STATION AT NOR. LIBRARY
Norwood, MA
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
OXBOWWAYLAND BGA
Wayland, MA
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
UMN 183-EVCHG-1
Minneapolis, MN
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
GF4EVA KLAMATH L2
Klamath, CA
Unknown First tracked Jan 17, 2026 |
Unknown | — | 7 kW | Jan 17, 2026 |
|
RCEA EV NETWORK ORLEANS VFD
Orleans, CA
Unknown First tracked Jan 17, 2026 |
Unknown | — | 19 kW | Jan 17, 2026 |
|
CAPITOL NORTHCAP255-256
Salt Lake City, UT
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
SMOKY HOLLOW STATION
Raleigh, NC
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
AXCA 18138
City of Industry, CA
Operational First tracked Jan 17, 2026 |
Operational | — | 12 kW | Jan 17, 2026 |
|
MIRATEMPE NOVUS ST2
Tempe, AZ
Operational First tracked Jan 17, 2026 |
Operational | — | 7 kW | Jan 17, 2026 |
|
HOTEL LEFT O
Sanford, FL
Operational First tracked Jan 17, 2026 |
Operational | — | 12 kW | Jan 17, 2026 |