Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Florence, SC
Average peak power unavailable
63 kW maximum
First tracked Jul 13, 2024
Doral, FL
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Duluth, GA
Average peak power unavailable
10 kW maximum
First tracked Jul 13, 2024
Macon, GA
Average peak power unavailable
63 kW maximum
First tracked Jul 13, 2024
Hoffman Estates, IL
Average peak power unavailable
12 kW maximum
First tracked Jul 13, 2024
Columbia, TN
84 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Corinth, MS
85 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Madison, WI
Average peak power unavailable
8 kW maximum
First tracked Jul 13, 2024
Alton, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Euless, TX
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Brighton, CO
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Brighton, CO
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Santa Fe, NM
81 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Santa Fe, NM
81 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Los Alamos, NM
61 kW avg peak
63 kW maximum
First tracked Jul 13, 2024
Albuquerque, NM
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Las Vegas, NV
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Las Vegas, NV
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CCHARGWPHPGM STATION 4
Pittsburgh, PA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
CHEVY 1 LVL3 EV CHARGER
Florence, SC
Operational First tracked Jul 13, 2024 |
Operational | — | 63 kW | Jul 13, 2024 |
|
COD EV STATION NEW STATION 2
Doral, FL
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
TRACKSIDE TRACKSIDE
Duluth, GA
Operational First tracked Jul 13, 2024 |
Operational | — | 10 kW | Jul 13, 2024 |
|
FS GENESIS SS GENESIS DC
Macon, GA
Operational First tracked Jul 13, 2024 |
Operational | — | 63 kW | Jul 13, 2024 |
|
MBHE
Hoffman Estates, IL
Operational First tracked Jul 13, 2024 |
Operational | — | 12 kW | Jul 13, 2024 |
|
CPWS1 STATION
Columbia, TN Reliability B Operational First tracked Jul 13, 2024 |
Operational | 84 kW | 125 kW | Jul 13, 2024 |
|
ACEPA ACE STATION
Corinth, MS Reliability B Operational First tracked Jul 13, 2024 |
Operational | 85 kW | 125 kW | Jul 13, 2024 |
|
STATION 01 HOURLY AND RAMP
Madison, WI
Operational First tracked Jul 13, 2024 |
Operational | — | 8 kW | Jul 13, 2024 |
|
ALTON TOYOTA FRONT STATION
Alton, IL
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
DFW AIRPORT DFW IOC EV
Euless, TX
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
AC
Brighton, CO
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
AC ANIMALSHELTER 1
Brighton, CO
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
NMDOT GO LVL 3 GO EV
Santa Fe, NM Reliability B Operational First tracked Jul 13, 2024 |
Operational | 81 kW | 125 kW | Jul 13, 2024 |
|
NMDOT GO LVL 3 GO EV
Santa Fe, NM Reliability B Operational First tracked Jul 13, 2024 |
Operational | 81 kW | 125 kW | Jul 13, 2024 |
|
LAC DPU WHITE ROCK
Los Alamos, NM Reliability A Operational First tracked Jul 13, 2024 |
Operational | 61 kW | 63 kW | Jul 13, 2024 |
|
UNM CON-CPH STN
Albuquerque, NM
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
SILVERTON HYATT
Las Vegas, NV
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
SILVERTON HYATT PARK 11
Las Vegas, NV
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
IRVINE CO OFC PDM 12265 01
San Diego, CA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |