Cheyenne, WY
Average peak power unavailable
19 kW maximum
First tracked Jul 14, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Cheyenne, WY
Average peak power unavailable
19 kW maximum
First tracked Jul 14, 2024
Edwardsville, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ithaca, NY
Average peak power unavailable
10 kW maximum
First tracked Jul 13, 2024
Hyannis, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ayer, MA
149 kW avg peak
350 kW maximum
First tracked Jul 13, 2024
Ayer, MA
149 kW avg peak
350 kW maximum
First tracked Jul 13, 2024
Ayer, MA
Average peak power unavailable
19 kW maximum
First tracked Jul 13, 2024
Hartford, CT
Average peak power unavailable
12 kW maximum
First tracked Jul 13, 2024
Richmond, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Hackensack, NJ
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
South Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Egg Harbor Township, NJ
Average peak power unavailable
12 kW maximum
First tracked Jul 13, 2024
Egg Harbor Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ottawa, ON
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Oswego, NY
Average peak power unavailable
19 kW maximum
First tracked Jul 13, 2024
Watkins Glen, NY
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ashland, VA
146 kW avg peak
350 kW maximum
First tracked Jul 13, 2024
Charlottesville, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
WYHORSERACING STATION
Cheyenne, WY
Operational First tracked Jul 14, 2024 |
Operational | — | 19 kW | Jul 14, 2024 |
|
TOWNSHIP HALL EDWARDSVILLE 1
Edwardsville, IL
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
GREENSTARCOOPER GREENSTAR 1
Ithaca, NY
Operational First tracked Jul 13, 2024 |
Operational | — | 10 kW | Jul 13, 2024 |
|
CCRTA EV-6 TRANSP DR
Hyannis, MA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
GERVAIS FORD PL-1-L
Ayer, MA Reliability A Operational First tracked Jul 13, 2024 |
Operational | 149 kW | 350 kW | Jul 13, 2024 |
|
GERVAIS FORD PL
Ayer, MA Reliability A Operational First tracked Jul 13, 2024 |
Operational | 149 kW | 350 kW | Jul 13, 2024 |
|
GERVAIS FORD L2
Ayer, MA
Operational First tracked Jul 13, 2024 |
Operational | — | 19 kW | Jul 13, 2024 |
|
GATEWAYPLAZA GATEWAY
Hartford, CT
Operational First tracked Jul 13, 2024 |
Operational | — | 12 kW | Jul 13, 2024 |
|
BOLTON VALLEY CHARGER 1
Richmond, VT
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
RUSSO PH 2 STATION
Hackensack, NJ
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
VT FEDERAL CSN-0151867
South Burlington, VT
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
LEXUS OF AC SVC STATION
Egg Harbor Township, NJ
Operational First tracked Jul 13, 2024 |
Operational | — | 12 kW | Jul 13, 2024 |
|
LEXUS OF AC STATION 1
Egg Harbor Township, NJ
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
AVENUE31CAPITAL STATION 1
Ottawa, ON
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
HHC COLUMBIA 50-60 STATION
Columbia, MD
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
HHC COLUMBIA 70 STATION
Columbia, MD
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
SHINEMAN SOUTH LEE HALL 4
Oswego, NY
Operational First tracked Jul 13, 2024 |
Operational | — | 19 kW | Jul 13, 2024 |
|
WGHH CHARGING HOTEL 1
Watkins Glen, NY
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
WHITTEN ASHLAND POWER LINK 1
Ashland, VA Reliability A Operational First tracked Jul 13, 2024 |
Operational | 146 kW | 350 kW | Jul 13, 2024 |
|
HIEX-UVA EV STATION 1
Charlottesville, VA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |