Edwards, CO
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Edwards, CO
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Newport Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Poulsbo, WA
Average peak power unavailable
8 kW maximum
First tracked Sep 20, 2024
Waltham, MA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Terryville, NY
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Adams, MA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Waterford, PA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Stow, OH
Average peak power unavailable
12 kW maximum
First tracked Sep 19, 2024
Marietta, GA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Columbus, GA
73 kW avg peak
63 kW maximum
First tracked Sep 19, 2024
Corpus Christi, TX
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Cypress, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Cypress, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Roseville, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Redmond, OR
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Richmond, BC
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
San Rafael, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 19, 2024
Kensington, NH
Average peak power unavailable
7 kW maximum
First tracked Sep 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
FOX HOLLOW BLDG K1
Edwards, CO
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
IRVINE CO OFC 610 NCD 0
Newport Beach, CA
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
TLCMP
Poulsbo, WA
Operational First tracked Sep 20, 2024 |
Operational | — | 8 kW | Sep 20, 2024 |
|
BXP CHARGERS 230CP-STATION 3
Waltham, MA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
HEATHERWOOD
Terryville, NY
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
GLEN O CENTER CHARGER
Adams, MA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
UPMC MONTEFIORE
Pittsburgh, PA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
TOYOTA OF ERIE DUAL CHARGE
Waterford, PA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
STOW CITY CNTR STOW
Stow, OH
Operational First tracked Sep 19, 2024 |
Operational | — | 12 kW | Sep 19, 2024 |
|
FAIRFIELDMARIET FAIRFIELDMARIET
Marietta, GA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
CCGVT CPE250 #1
Columbus, GA Reliability C Operational First tracked Sep 19, 2024 |
Operational | 73 kW | 63 kW | Sep 19, 2024 |
|
CCIA EVC
Corpus Christi, TX
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
M&O
Cypress, CA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
M&O
Cypress, CA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
HFS TORRANCE T2 STATION D
Torrance, CA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
MLIC-201CR - 01 MLIC-201CR 01
Roseville, CA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
DPL REDMOND REDMOND LIBRARY
Redmond, OR
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
WEST CHARGER STATION
Richmond, BC
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
RVSD RVSD
San Rafael, CA
Operational First tracked Sep 19, 2024 |
Operational | — | 7 kW | Sep 19, 2024 |
|
EASTMANS CORNER CHARGER
Kensington, NH
Unknown First tracked Sep 18, 2024 |
Unknown | — | 7 kW | Sep 18, 2024 |