Claremont, NH
149 kW avg peak
350 kW maximum
First tracked Sep 21, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Claremont, NH
149 kW avg peak
350 kW maximum
First tracked Sep 21, 2024
Saranac Lake, NY
Average peak power unavailable
19 kW maximum
First tracked Sep 21, 2024
Stouffville, ON
Average peak power unavailable
7 kW maximum
First tracked Sep 21, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Sep 21, 2024
Ann Arbor, MI
Average peak power unavailable
63 kW maximum
First tracked Sep 21, 2024
Kimball, TN
Average peak power unavailable
125 kW maximum
First tracked Sep 21, 2024
Palmetto, FL
Average peak power unavailable
19 kW maximum
First tracked Sep 21, 2024
Mesa, AZ
Average peak power unavailable
7 kW maximum
First tracked Sep 21, 2024
Folsom, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 21, 2024
Poulsbo, WA
Average peak power unavailable
4 kW maximum
First tracked Sep 21, 2024
Poulsbo, WA
Average peak power unavailable
8 kW maximum
First tracked Sep 21, 2024
Willow Creek, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 21, 2024
Williston, VT
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Cicero, NY
Average peak power unavailable
12 kW maximum
First tracked Sep 20, 2024
McLean, VA
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Guelph, ON
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Social Circle, GA
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
Edwards, CO
Average peak power unavailable
7 kW maximum
First tracked Sep 20, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CUMB FARMS EV POINT 5419-2
Claremont, NH Reliability A Operational First tracked Sep 21, 2024 |
Operational | 149 kW | 350 kW | Sep 21, 2024 |
|
RIVERTRAIL RIVERTRAIL EV
Saranac Lake, NY
Operational First tracked Sep 21, 2024 |
Operational | — | 19 kW | Sep 21, 2024 |
|
LONGOS EV STATION#34-1
Stouffville, ON
Operational First tracked Sep 21, 2024 |
Operational | — | 7 kW | Sep 21, 2024 |
|
UPMC MONTEFIORE GRG
Pittsburgh, PA
Operational First tracked Sep 21, 2024 |
Operational | — | 7 kW | Sep 21, 2024 |
|
WCC HFC H
Ann Arbor, MI
Operational First tracked Sep 21, 2024 |
Operational | — | 63 kW | Sep 21, 2024 |
|
SVEC KIMBALL
Kimball, TN
Operational First tracked Sep 21, 2024 |
Operational | — | 125 kW | Sep 21, 2024 |
|
ARTISAN LAKES STATION 1
Palmetto, FL
Operational First tracked Sep 21, 2024 |
Operational | — | 19 kW | Sep 21, 2024 |
|
THE ASTER COMM ASTER1
Mesa, AZ
Operational First tracked Sep 21, 2024 |
Operational | — | 7 kW | Sep 21, 2024 |
|
BV 4100 STATION 4
Folsom, CA
Operational First tracked Sep 21, 2024 |
Operational | — | 7 kW | Sep 21, 2024 |
|
TLCMP D
Poulsbo, WA
Operational First tracked Sep 21, 2024 |
Operational | — | 4 kW | Sep 21, 2024 |
|
TLCMP
Poulsbo, WA
Operational First tracked Sep 21, 2024 |
Operational | — | 8 kW | Sep 21, 2024 |
|
BERRY SUMMIT BERRY SUMMIT
Willow Creek, CA
Operational First tracked Sep 21, 2024 |
Operational | — | 7 kW | Sep 21, 2024 |
|
TCE AQ WIL TCE-BOWMAN-VT
Williston, VT
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
BURDICK BMW CP6K
Cicero, NY
Operational First tracked Sep 20, 2024 |
Operational | — | 12 kW | Sep 20, 2024 |
|
TRILLIUM TYSONS TRILLIUM
McLean, VA
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
ROYAL CITY STATION 1
Guelph, ON
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
NCG NCG
Social Circle, GA
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
ILLINI CHARGING C7 - EV3
Champaign, IL
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
NAMASTE SOLAR 1 888 FEDERAL WST
Denver, CO
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |
|
FOX HOLLOW BLDG A
Edwards, CO
Operational First tracked Sep 20, 2024 |
Operational | — | 7 kW | Sep 20, 2024 |