Bakersfield, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Bakersfield, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Hammond, IN
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Hammond, IN
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Hammond, IN
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Hammond, IN
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Washington, MI
90 kW avg peak
125 kW maximum
First tracked Oct 27, 2024
Wixom, MI
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Avondale, AZ
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
West Kelowna, BC
Average peak power unavailable
19 kW maximum
First tracked Oct 27, 2024
East Wenatchee, WA
153 kW avg peak
350 kW maximum
First tracked Oct 27, 2024
Hamilton, OH
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Cincinnati, OH
Average peak power unavailable
10 kW maximum
First tracked Oct 27, 2024
Lone Tree, CO
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Lone Tree, CO
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Savannah, GA
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Scottsbluff, NE
83 kW avg peak
125 kW maximum
First tracked Oct 27, 2024
Toronto, ON
Average peak power unavailable
7 kW maximum
First tracked Oct 27, 2024
Toronto, ON
68 kW avg peak
63 kW maximum
First tracked Oct 27, 2024
Toronto, ON
63 kW avg peak
63 kW maximum
First tracked Oct 27, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BILWRIGHT SERVICE CENTER
Bakersfield, CA
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
PURDUE CALUMET SOUTH CAMPUS 1
Hammond, IN
Unknown First tracked Oct 27, 2024 |
Unknown | — | 7 kW | Oct 27, 2024 |
|
PURDUE CALUMET FNRC
Hammond, IN
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
PURDUE CALUMET ANDERSON
Hammond, IN
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
PURDUE CALUMET SOUTH CAMPUS 2
Hammond, IN
Unknown First tracked Oct 27, 2024 |
Unknown | — | 7 kW | Oct 27, 2024 |
|
TOWNS MARATHON DC STATION
Washington, MI Reliability D Operational First tracked Oct 27, 2024 |
Operational | 90 kW | 125 kW | Oct 27, 2024 |
|
WALLED LAKE WESTERN
Wixom, MI
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
AVONDALE PD DETENTION
Avondale, AZ
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
TLC EV STATION STATION
West Kelowna, BC
Operational First tracked Oct 27, 2024 |
Operational | — | 19 kW | Oct 27, 2024 |
|
DCPUD HQ PL
East Wenatchee, WA Reliability A Operational First tracked Oct 27, 2024 |
Operational | 153 kW | 350 kW | Oct 27, 2024 |
|
HAMILTON OHIO 325 MAIN ST
Hamilton, OH
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
BLOCKYARD BLOCKYARD
Austin, TX
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
ESRW ESRW-MELROSE
Cincinnati, OH
Operational First tracked Oct 27, 2024 |
Operational | — | 10 kW | Oct 27, 2024 |
|
SKYRIDGEMEDICAL
Lone Tree, CO
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
SKYRIDGEMEDICAL #4
Lone Tree, CO
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
SAVANNAH 1 STATION
Savannah, GA
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
NPPD EV STATION SB SINCLAIR DC
Scottsbluff, NE Reliability C Operational First tracked Oct 27, 2024 |
Operational | 83 kW | 125 kW | Oct 27, 2024 |
|
MANULIFE LEVEL12
Toronto, ON
Operational First tracked Oct 27, 2024 |
Operational | — | 7 kW | Oct 27, 2024 |
|
GREENP CP215-00
Toronto, ON Reliability D Operational First tracked Oct 27, 2024 |
Operational | 68 kW | 63 kW | Oct 27, 2024 |
|
GREENP CP
Toronto, ON Reliability B Operational First tracked Oct 27, 2024 |
Operational | 63 kW | 63 kW | Oct 27, 2024 |