ChargePoint
B+30,132
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Seal Beach, CA
7kW max
Long Beach, CA
7kW max
Long Beach, CA
12kW max
Long Beach, CA
7kW max
Long Beach, CA
7kW max
Signal Hill, CA
7kW max
Laurel, MD
7kW max
College Park, MD
7kW max
Reading, MA
7kW max
Wakefield, MA
7kW max
Woburn, MA
7kW max
Reading, MA
7kW max
Reading, MA
7kW max
Woburn, MA
7kW max
Reading, MA
63kW max
Covina, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Glendale, CA
7kW max
Burbank, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| ACP MANAGEMENT SEAL BEACH #1 (Seal Beach, CA) | — | 7 | 28 Oct | ||
| LONG BEACH SOLAR CHARGER 1 (Long Beach, CA) | — | 7 | 28 Oct | ||
| LONG BEACH BMW CHARGER (Long Beach, CA) | — | 12 | 28 Oct | ||
| OIL & GAS OIL & GAS 0 (Long Beach, CA) | — | 7 | 28 Oct | ||
| ESSEX PATHWAYS 0 (Long Beach, CA) | — | 7 | 28 Oct | ||
| MBZ LONG BEACH MBZ LONG BEACH (Signal Hill, CA) | — | 7 | 28 Oct | ||
| WSSC RGH (Laurel, MD) | — | 7 | 28 Oct | ||
| IKEA USA COLLEGE PARK 1 (College Park, MD) | — | 7 | 28 Oct | ||
| RMLD RMLD ASH ST ST (Reading, MA) | — | 7 | 28 Oct | ||
| LAKESIDE PARK LAKESIDE INN (Wakefield, MA) | — | 7 | 28 Oct | ||
| TARGET T1266 STATION (Woburn, MA) | — | 7 | 28 Oct | ||
| RMLD READ DEPOT STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| RMLD SUMMIT DR STA1 (Reading, MA) | — | 7 | 28 Oct | ||
| EMERY FLATS BUILDING 2 (B (Woburn, MA) | — | 7 | 28 Oct | ||
| NA208940 HND L3 (Reading, MA) | — | 63 | 28 Oct | ||
| IKEA USA COVINA (Covina, CA) | — | 7 | 28 Oct | ||
| IKEA USA BURBANK (Burbank, CA) | — | 7 | 28 Oct | ||
| BWP EV CHARGE VERD&LAKE1 (Burbank, CA) | — | 7 | 28 Oct | ||
| BRIO BRIOAPARTMENTS (Glendale, CA) | — | 7 | 28 Oct | ||
| IKEA USA BURBANK 3 (Burbank, CA) | — | 7 | 28 Oct |