ChargePoint
B+29,850
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Winston-Salem, NC
7kW max
Raleigh, NC
7kW max
Macon, GA
4kW max
Auburn, AL
7kW max
Peachtree City, GA
7kW max
Hatteras, NC
7kW max
Columbus, GA
12kW max
Columbus, GA
12kW max
Sherman, TX
7kW max
Opelika, AL
80kW max
Columbus, GA
8kW max
Alexander City, AL
7kW max
Columbus, GA
154kW avg
200kW max
Columbus, GA
154kW avg
200kW max
Valley, AL
160kW max
Smiths Station, AL
194kW avg
200kW max
Auburn, AL
7kW max
Plano, TX
7kW max
Richardson, TX
13kW max
Rockwall, TX
19kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| WINSTON-SALEM CENTRAL PARK (Winston-Salem, NC) | — | 7 | 15 Aug | ||
| POINT SEABOARD (Raleigh, NC) | — | 7 | 15 Aug | ||
| HOME2 MACON STATION (Macon, GA) | — | 4 | 15 Aug | ||
| ACCOLADE AUBURN 1ST FLOOR (Auburn, AL) | — | 7 | 15 Aug | ||
| PTC DERM PTCDERM (Peachtree City, GA) | — | 7 | 15 Aug | ||
| NCDOT HATTERAS FERRY (Hatteras, NC) | — | 7 | 15 Aug | ||
| CCGVT 20TH 12TH ST (Columbus, GA) | — | 12 | 15 Aug | ||
| CCGVT CSN-017907 (Columbus, GA) | — | 12 | 15 Aug | ||
| TI EVG (Sherman, TX) | — | 7 | 15 Aug | ||
| OPTIMUS ENERGY OPELIKA BK (Opelika, AL) | — | 80 | 15 Aug | ||
| CCGVT 12 W 12TH ST (Columbus, GA) | — | 8 | 15 Aug | ||
| ADVANCE CARE AC CHARGER (Alexander City, AL) | — | 7 | 15 Aug | ||
| A | LOT CHARGERS PWRLINK2000-1 (Columbus, GA) | 154 | 200 | 15 Aug | |
| A | LOT CHARGERS (Columbus, GA) | 154 | 200 | 15 Aug | |
| OPTIMUS CPO VALLEY BK (Valley, AL) | — | 160 | 15 Aug | ||
| A | LOVE'S 774 - AL #774 DC (Smiths Station, AL) | 194 | 200 | 15 Aug | |
| ACCOLADE AUBURN (Auburn, AL) | — | 7 | 15 Aug | ||
| PLANO STATION (Plano, TX) | — | 7 | 15 Aug | ||
| OBE RENAISSANCE RI (Richardson, TX) | — | 13 | 15 Aug | ||
| FORD OF ROCKWAL CP6000-1 (Rockwall, TX) | — | 19 | 15 Aug |