Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
El Mirage, AZ
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Hollister, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Hialeah, FL
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Danville, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Normal, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Danville, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Rantoul, IL
152 kW avg peak
350 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Circleville, OH
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Athens, OH
Average peak power unavailable
19 kW maximum
First tracked Nov 3, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
DPAC GARAGE 2 PERFRMNG ARTS 2
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CCD CHARGING ACME LOT
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CCD CHARGING JUSTICE CENTER
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HARVARD GULCH
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
MICROSOFT PHX86-0
El Mirage, AZ
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HOLLISTER-PW COH STATION 1
Hollister, CA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
METRO GRANDE I CHARGER
Hialeah, FL
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
LOFT CINEMA SOUTH CHARGER
Tucson, AZ
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CARLE FOUNDATIO CATR ASC 2
Danville, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
ILLINI CHARGING CONF CNTR 02
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
FDC, LLC STATION 3
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
HCC CHARGING ST ACEC
Normal, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
ILLINI CHARGING CONF CNTR 01
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
FDC, LLC STATION 4
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
FDC, LLC STATION 2
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
CARLE FOUNDATIO ATR ASC 4
Danville, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
SHIELDS1
Rantoul, IL Reliability A Operational First tracked Nov 3, 2025 |
Operational | 152 kW | 350 kW | Nov 3, 2025 |
|
FDC, LLC STATION 1
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
BERGER HOSPITAL BERGER
Circleville, OH
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
DONWOODAUTO D
Athens, OH
Operational First tracked Nov 3, 2025 |
Operational | — | 19 kW | Nov 3, 2025 |