Falls Church, VA
Average peak power unavailable
12 kW maximum
First tracked Nov 5, 2025
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Falls Church, VA
Average peak power unavailable
12 kW maximum
First tracked Nov 5, 2025
Alexandria, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 5, 2025
Springfield, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 5, 2025
Des Moines, IA
Average peak power unavailable
12 kW maximum
First tracked Nov 5, 2025
Fairway, KS
Average peak power unavailable
8 kW maximum
First tracked Nov 5, 2025
Fort Collins, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 5, 2025
San Carlos, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 5, 2025
Charlottesville, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Prince Frederick, MD
Average peak power unavailable
4 kW maximum
First tracked Nov 4, 2025
Manassas, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Waynesboro, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Harrisonburg, VA
91 kW avg peak
500 kW maximum
First tracked Nov 4, 2025
Lake Ridge, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Harrisonburg, VA
91 kW avg peak
500 kW maximum
First tracked Nov 4, 2025
Fredericksburg, VA
Average peak power unavailable
19 kW maximum
First tracked Nov 4, 2025
Fairfax, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Charlottesville, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Fredericksburg, VA
Average peak power unavailable
12 kW maximum
First tracked Nov 4, 2025
Alma, NE
Average peak power unavailable
13 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
MODERA FALLS 1-21
Falls Church, VA
Operational First tracked Nov 5, 2025 |
Operational | — | 12 kW | Nov 5, 2025 |
|
GARAGE ENTRY GARAGE ENTRY
Alexandria, VA
Operational First tracked Nov 5, 2025 |
Operational | — | 7 kW | Nov 5, 2025 |
|
SFD STATION 13
Springfield, IL
Operational First tracked Nov 5, 2025 |
Operational | — | 7 kW | Nov 5, 2025 |
|
HEARTLAND ANIM HEARTLAND ANIM
Des Moines, IA
Operational First tracked Nov 5, 2025 |
Operational | — | 12 kW | Nov 5, 2025 |
|
THE FIELDSTON STATION
Fairway, KS
Operational First tracked Nov 5, 2025 |
Operational | — | 8 kW | Nov 5, 2025 |
|
JESSUP FARM PICKLR
Fort Collins, CO
Operational First tracked Nov 5, 2025 |
Operational | — | 7 kW | Nov 5, 2025 |
|
WC 800 INDUST 1
San Carlos, CA
Operational First tracked Nov 5, 2025 |
Operational | — | 7 kW | Nov 5, 2025 |
|
UVA FONTAINE
Charlottesville, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
BAYSIDE TOYOTA CHEVY
Prince Frederick, MD
Operational First tracked Nov 4, 2025 |
Operational | — | 4 kW | Nov 4, 2025 |
|
1800 CLUBHOUSE CLUB
Manassas, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
BLUE RIDGE CHILDRENSMUSEUM
Waynesboro, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HWY81TRUCKSTOP POWER LINK
Harrisonburg, VA Reliability A Operational First tracked Nov 4, 2025 |
Operational | 91 kW | 500 kW | Nov 4, 2025 |
|
WLR STATION 1 WLR EV
Lake Ridge, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HWY81TRUCKSTOP POWER LINK 1
Harrisonburg, VA Reliability A Operational First tracked Nov 4, 2025 |
Operational | 91 kW | 500 kW | Nov 4, 2025 |
|
PUBLISHER
Fredericksburg, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 19 kW | Nov 4, 2025 |
|
FAIRFAX COUNTY MONUMENT PG
Fairfax, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
PVCC
Charlottesville, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
USPA AFPQO000001JHLT
Fredericksburg, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 12 kW | Nov 4, 2025 |
|
CITY OF ALMA ALMA BAY 1/2
Alma, NE
Operational First tracked Nov 4, 2025 |
Operational | — | 13 kW | Nov 4, 2025 |
|
CCD CHARGING BANNOCK LOT 1
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |