Tesla
Pickering, ON
updated
Pickering, ON
Brock Road, 1899, Pickering, ON L1V 4H4, CAN
Details
Energy
CA$0.56/kWh
Idle fee
CA$0.50/min after 5 min
CA$1.00/min after 5 min (at 100% site congestion level)
Idle fee is waived for the first time.
If the vehicle is moved within five minutes of the vehicle reaching a full charge, the idle fee is waived.
Destination charging does not incur idle fee.
Idle fee depends on the site congestion level and rates may vary.
Chargers
1A
NACS 150 kW ⚡️⚡️⚡️
1B
NACS 150 kW ⚡️⚡️⚡️
2A
NACS 150 kW ⚡️⚡️⚡️
2B
NACS 150 kW ⚡️⚡️⚡️
3A
NACS 150 kW ⚡️⚡️⚡️
3B
NACS 150 kW ⚡️⚡️⚡️
4A
NACS 150 kW ⚡️⚡️⚡️
4B
NACS 150 kW ⚡️⚡️⚡️
5A
NACS 150 kW ⚡️⚡️⚡️
5B
NACS 150 kW ⚡️⚡️⚡️
6A
NACS 150 kW ⚡️⚡️⚡️
6B
NACS 150 kW ⚡️⚡️⚡️
7A
NACS 150 kW ⚡️⚡️⚡️
7B
NACS 150 kW ⚡️⚡️⚡️
8A
NACS 150 kW ⚡️⚡️⚡️
8B
NACS 150 kW ⚡️⚡️⚡️
9A
NACS 150 kW ⚡️⚡️⚡️
9B
NACS 150 kW ⚡️⚡️⚡️
10A
NACS 150 kW ⚡️⚡️⚡️
10B
NACS 150 kW ⚡️⚡️⚡️
1A
NACS 150 kW ⚡️⚡️⚡️
1B
NACS 150 kW ⚡️⚡️⚡️
2A
NACS 150 kW ⚡️⚡️⚡️
2B
NACS 150 kW ⚡️⚡️⚡️
3A
NACS 150 kW ⚡️⚡️⚡️
3B
NACS 150 kW ⚡️⚡️⚡️
4A
NACS 150 kW ⚡️⚡️⚡️
4B
NACS 150 kW ⚡️⚡️⚡️
5A
NACS 150 kW ⚡️⚡️⚡️
5B
NACS 150 kW ⚡️⚡️⚡️
6A
NACS 150 kW ⚡️⚡️⚡️
6B
NACS 150 kW ⚡️⚡️⚡️
7A
NACS 150 kW ⚡️⚡️⚡️
7B
NACS 150 kW ⚡️⚡️⚡️
8A
NACS 150 kW ⚡️⚡️⚡️
8B
NACS 150 kW ⚡️⚡️⚡️
9A
NACS 150 kW ⚡️⚡️⚡️
9B
NACS 150 kW ⚡️⚡️⚡️
10A
NACS 150 kW ⚡️⚡️⚡️
10B
NACS 150 kW ⚡️⚡️⚡️