Tesla
Dover, NH
updated
🔋 Max Power
250 kW
🏪 Always Open
✅
Details
Sterling Wy, 200, Dover, NH 03820, USA
Energy
$0.51/kWh
Idle fee
$0.50/min after 5 min
$1.00/min after 5 min (at 100% site congestion level)
Idle fee is waived for the first time.
If the vehicle is moved within five minutes of the vehicle reaching a full charge, the idle fee is waived.
Destination charging does not incur idle fee.
Idle fee depends on the site congestion level and rates may vary.
Chargers
1A
NACS 250 kW ⚡️⚡️⚡️
1B
NACS 250 kW ⚡️⚡️⚡️
1C
NACS 250 kW ⚡️⚡️⚡️
1D
NACS 250 kW ⚡️⚡️⚡️
2A
NACS 250 kW ⚡️⚡️⚡️
2B
NACS 250 kW ⚡️⚡️⚡️
2C
NACS 250 kW ⚡️⚡️⚡️
2D
NACS 250 kW ⚡️⚡️⚡️
3A
NACS 250 kW ⚡️⚡️⚡️
3B
NACS 250 kW ⚡️⚡️⚡️
3C
NACS 250 kW ⚡️⚡️⚡️
3D
NACS 250 kW ⚡️⚡️⚡️
1A
NACS 250 kW ⚡️⚡️⚡️
1B
NACS 250 kW ⚡️⚡️⚡️
1C
NACS 250 kW ⚡️⚡️⚡️
1D
NACS 250 kW ⚡️⚡️⚡️
2A
NACS 250 kW ⚡️⚡️⚡️
2B
NACS 250 kW ⚡️⚡️⚡️
2C
NACS 250 kW ⚡️⚡️⚡️
2D
NACS 250 kW ⚡️⚡️⚡️
3A
NACS 250 kW ⚡️⚡️⚡️
3B
NACS 250 kW ⚡️⚡️⚡️
3C
NACS 250 kW ⚡️⚡️⚡️
3D
NACS 250 kW ⚡️⚡️⚡️