Costa Mesa, CA
169 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Costa Mesa, CA
169 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
181 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Average peak power unavailable
150 kW maximum
First tracked Jul 18, 2024
Irvine, CA
Average peak power unavailable
72 kW maximum
First tracked Jul 18, 2024
Irvine, CA
131 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
182 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Downey, CA
Average peak power unavailable
72 kW maximum
First tracked Jul 18, 2024
189 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
166 kW avg peak
72 kW maximum
First tracked Jul 18, 2024
Downey, CA
Average peak power unavailable
72 kW maximum
First tracked Jul 18, 2024
Whittier, CA
191 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
City of Industry, CA
149 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
167 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
El Monte, CA
189 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
157 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Glendale, CA
5 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
46 kW avg peak
72 kW maximum
First tracked Jul 18, 2024
180 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Culver City, CA
0 kW avg peak
250 kW maximum
First tracked Jul 18, 2024
Average peak power unavailable
150 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
Costa Mesa, CA - Bristol Street
Costa Mesa, CA Reliability A Operational First tracked Jul 18, 2024 |
Operational | 169 kW | 250 kW | Jul 18, 2024 |
|
Newport Beach, CA
Reliability B Operational First tracked Jul 18, 2024 |
Operational | 181 kW | 250 kW | Jul 18, 2024 |
|
Fountain Valley, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 150 kW | Jul 18, 2024 |
|
Irvine, CA - Michelson Drive
Irvine, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 72 kW | Jul 18, 2024 |
|
Irvine, CA - Main Street
Irvine, CA Reliability F Operational First tracked Jul 18, 2024 |
Operational | 131 kW | 250 kW | Jul 18, 2024 |
|
Cypress, CA
Reliability C Operational First tracked Jul 18, 2024 |
Operational | 182 kW | 250 kW | Jul 18, 2024 |
|
Downey, CA - Lakewood Boulevard
Downey, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 72 kW | Jul 18, 2024 |
|
Lakewood, CA
Reliability B Operational First tracked Jul 18, 2024 |
Operational | 189 kW | 250 kW | Jul 18, 2024 |
|
Rowland Heights, CA
Reliability B Operational First tracked Jul 18, 2024 |
Operational | 166 kW | 72 kW | Jul 18, 2024 |
|
Downey, CA - Stonewood Street
Downey, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 72 kW | Jul 18, 2024 |
|
Whittier, CA - Washington Boulevard
Whittier, CA Reliability A Operational First tracked Jul 18, 2024 |
Operational | 191 kW | 250 kW | Jul 18, 2024 |
|
City of Industry, CA - Colima Road
City of Industry, CA Reliability A Operational First tracked Jul 18, 2024 |
Operational | 149 kW | 250 kW | Jul 18, 2024 |
|
Brea, CA
Reliability B Operational First tracked Jul 18, 2024 |
Operational | 167 kW | 250 kW | Jul 18, 2024 |
|
El Monte, CA - Peck Road
El Monte, CA Reliability B Operational First tracked Jul 18, 2024 |
Operational | 189 kW | 250 kW | Jul 18, 2024 |
|
San Gabriel, CA
Reliability A Operational First tracked Jul 18, 2024 |
Operational | 157 kW | 250 kW | Jul 18, 2024 |
|
Glendale, CA - Harvey Drive
Glendale, CA Reliability F Operational First tracked Jul 18, 2024 |
Operational | 5 kW | 250 kW | Jul 18, 2024 |
|
Glendale, CA
Reliability F Operational First tracked Jul 18, 2024 |
Operational | 46 kW | 72 kW | Jul 18, 2024 |
|
Long Beach, CA
Reliability B Operational First tracked Jul 18, 2024 |
Operational | 180 kW | 250 kW | Jul 18, 2024 |
|
Culver City, CA - 11924 Washington Blvd
Culver City, CA Reliability F Operational First tracked Jul 18, 2024 |
Operational | 0 kW | 250 kW | Jul 18, 2024 |
|
Culver City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 150 kW | Jul 18, 2024 |