Miami, FL
194 kW avg peak
250 kW maximum
First tracked Sep 27, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Miami, FL
194 kW avg peak
250 kW maximum
First tracked Sep 27, 2024
197 kW avg peak
250 kW maximum
First tracked Sep 27, 2024
Vallejo, CA
191 kW avg peak
325 kW maximum
First tracked Sep 27, 2024
Hollister, CA
195 kW avg peak
250 kW maximum
First tracked Sep 26, 2024
Austin, TX
201 kW avg peak
250 kW maximum
First tracked Sep 25, 2024
213 kW avg peak
325 kW maximum
First tracked Sep 25, 2024
Upland, CA
199 kW avg peak
250 kW maximum
First tracked Sep 25, 2024
Truckee, CA
198 kW avg peak
325 kW maximum
First tracked Sep 24, 2024
Atascadero, CA
200 kW avg peak
250 kW maximum
First tracked Sep 23, 2024
Peabody, MA
201 kW avg peak
325 kW maximum
First tracked Sep 21, 2024
206 kW avg peak
325 kW maximum
First tracked Sep 21, 2024
Dublin, CA
198 kW avg peak
325 kW maximum
First tracked Sep 21, 2024
198 kW avg peak
325 kW maximum
First tracked Sep 21, 2024
197 kW avg peak
325 kW maximum
First tracked Sep 19, 2024
Lady Lake, FL
187 kW avg peak
325 kW maximum
First tracked Sep 19, 2024
Harrisburg, PA
192 kW avg peak
325 kW maximum
First tracked Sep 18, 2024
Portland, OR
195 kW avg peak
250 kW maximum
First tracked Sep 18, 2024
194 kW avg peak
250 kW maximum
First tracked Sep 17, 2024
209 kW avg peak
325 kW maximum
First tracked Sep 17, 2024
Dayton, OH
207 kW avg peak
325 kW maximum
First tracked Sep 14, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
Miami, FL - Blue Lagoon Drive
Miami, FL Reliability D Operational First tracked Sep 27, 2024 |
Operational | 194 kW | 250 kW | Sep 27, 2024 |
|
Waxahachie, TX
Reliability C Operational First tracked Sep 27, 2024 |
Operational | 197 kW | 250 kW | Sep 27, 2024 |
|
Vallejo, CA - Robles Way
Vallejo, CA Reliability A Operational First tracked Sep 27, 2024 |
Operational | 191 kW | 325 kW | Sep 27, 2024 |
|
Hollister, CA - Airline Highway
Hollister, CA Reliability A Operational First tracked Sep 26, 2024 |
Operational | 195 kW | 250 kW | Sep 26, 2024 |
|
Austin, TX - East Stassney Lane
Austin, TX Reliability B Operational First tracked Sep 25, 2024 |
Operational | 201 kW | 250 kW | Sep 25, 2024 |
|
Boulder City, NV
Reliability A Operational First tracked Sep 25, 2024 |
Operational | 213 kW | 325 kW | Sep 25, 2024 |
|
Upland, CA - Arrow Route
Upland, CA Reliability B Operational First tracked Sep 25, 2024 |
Operational | 199 kW | 250 kW | Sep 25, 2024 |
|
Truckee, CA - Deerfield Drive
Truckee, CA Reliability A Operational First tracked Sep 24, 2024 |
Operational | 198 kW | 325 kW | Sep 24, 2024 |
|
Atascadero, CA - El Camino Real
Atascadero, CA Reliability B Operational First tracked Sep 23, 2024 |
Operational | 200 kW | 250 kW | Sep 23, 2024 |
|
Peabody, MA - Newbury Street
Peabody, MA Reliability C Operational First tracked Sep 21, 2024 |
Operational | 201 kW | 325 kW | Sep 21, 2024 |
|
Bloomingdale, IL
Reliability A Operational First tracked Sep 21, 2024 |
Operational | 206 kW | 325 kW | Sep 21, 2024 |
|
Dublin, CA - 4288 Dublin Boulevard
Dublin, CA Reliability A Operational First tracked Sep 21, 2024 |
Operational | 198 kW | 325 kW | Sep 21, 2024 |
|
Pacifica, CA
Reliability A Operational First tracked Sep 21, 2024 |
Operational | 198 kW | 325 kW | Sep 21, 2024 |
|
West Seneca, NY
Reliability B Operational First tracked Sep 19, 2024 |
Operational | 197 kW | 325 kW | Sep 19, 2024 |
|
Lady Lake, FL - US-441
Lady Lake, FL Reliability A Operational First tracked Sep 19, 2024 |
Operational | 187 kW | 325 kW | Sep 19, 2024 |
|
Harrisburg, PA - 2547 Brindle Dr
Harrisburg, PA Reliability A Operational First tracked Sep 18, 2024 |
Operational | 192 kW | 325 kW | Sep 18, 2024 |
|
Portland, OR - Northeast Weidler Street
Portland, OR Reliability A Operational First tracked Sep 18, 2024 |
Operational | 195 kW | 250 kW | Sep 18, 2024 |
|
Aston, PA
Reliability A Operational First tracked Sep 17, 2024 |
Operational | 194 kW | 250 kW | Sep 17, 2024 |
|
Elmira, NY
Reliability A Operational First tracked Sep 17, 2024 |
Operational | 209 kW | 325 kW | Sep 17, 2024 |
|
Dayton, OH - North Springboro Pike
Dayton, OH Reliability A Operational First tracked Sep 14, 2024 |
Operational | 207 kW | 325 kW | Sep 14, 2024 |