171
Sites
144
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 18% B: 14% C: 14% D: 4% F: 4%

Sites

Average peak power and reliability grades are reported by Rivian.

Hearne TX

Hearne, TX

Operational Reliability A

165 kW avg peak

180 kW maximum

First tracked Sep 4, 2024

C45071 Scarborough EV

Scarborough, ON

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 31, 2024

C47088 Mill Bay

Mill Bay, BC

Operational Reliability C

155 kW avg peak

180 kW maximum

First tracked Aug 31, 2024

Topgolf The Colony

The Colony, TX

Operational

Average peak power unavailable

10 kW maximum

First tracked Aug 28, 2024

Topgolf - Fort Worth

Fort Worth, TX

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 28, 2024

C02536 Sheridan Way

Mississauga, ON

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 25, 2024

C81612 YYC

Calgary, AB

Operational Reliability B

165 kW avg peak

180 kW maximum

First tracked Aug 25, 2024

C20810 Abbotsford

Abbotsford, BC

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 24, 2024

CUT by Cinemark Frisco

Frisco, TX

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 23, 2024

C45065 Toronto EV

Toronto, ON

Operational Reliability B

160 kW avg peak

180 kW maximum

First tracked Aug 22, 2024

C20447 Markham EV

Markham, ON

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 22, 2024

Queen City Center

Cumberland, MD

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 22, 2024

C81527 Lakeview

Invermere, BC

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 22, 2024

C07514 Langley EV

Langley, BC

Operational Reliability B

150 kW avg peak

180 kW maximum

First tracked Aug 22, 2024

C20530 Maple Ridge EV

Maple Ridge, BC

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 22, 2024

C12056 Parksville

Parksville, BC

Operational Reliability C

172 kW avg peak

180 kW maximum

First tracked Aug 22, 2024

C80001 Langford EV

Langford, BC

Operational Reliability C

152 kW avg peak

180 kW maximum

First tracked Aug 22, 2024

Port Orchard

PORT ORCHARD, WA

Operational Reliability C

140 kW avg peak

180 kW maximum

First tracked Aug 10, 2024

Page 6 of 9

This action cannot be undone.