Shell Recharge
B-2,208
Sites
109
Avg kW
Reliability Distribution
A: 1%
B: 2%
C: 1%
D: 1%
Sites
Portland, OR
10kW max
Hillsboro, OR
10kW max
Portland, OR
10kW max
Hillsboro, OR
10kW max
10kW max
Port Orchard, WA
10kW max
Cary, NC
10kW max
Mississauga, ON
180kW max
Calgary, AB
180kW max
Charlotte Hall, MD
50kW max
La Plata, MD
7kW max
Anaheim, CA
10kW max
Abbotsford, BC
180kW max
Vancouver, BC
10kW max
Hyannis, MA
10kW max
Cambridge, MA
10kW max
Framingham, MA
10kW max
Northborough, MA
10kW max
Milford, CT
10kW max
Hicksville, NY
10kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| Washington Square (Portland, OR) | — | 10 | 28 Aug | ||
| Walgreens 7010 NE CORNELL RD HILLSBORO (Hillsboro, OR) | — | 10 | 28 Aug | ||
| Walgreens 13470 NW CORNELL RD PORTLAND (Portland, OR) | — | 10 | 28 Aug | ||
| Walgreens 955 SE BASELINE ST HILLSBORO (Hillsboro, OR) | — | 10 | 28 Aug | ||
| Walgreens 2100 NE 139TH ST VANCOUVER (St, WA) | — | 10 | 28 Aug | ||
| 2OXX-01 Mile Hill Plaza (Port Orchard, WA) | — | 10 | 28 Aug | ||
| Meridian at Harrison Pointe (Cary, NC) | — | 10 | 25 Aug | ||
| C02536 Sheridan Way (Mississauga, ON) | — | 180 | 25 Aug | ||
| C81612 YYC (Calgary, AB) | — | 180 | 25 Aug | ||
| 53363A SMECO - Charlotte Hall Library (Charlotte Hall, MD) | — | 50 | 24 Aug | ||
| SMECO - CSM LaPlata (La Plata, MD) | — | 7 | 24 Aug | ||
| GardenWalk Garage Level P (Anaheim, CA) | — | 10 | 24 Aug | ||
| C20810 Abbotsford (Abbotsford, BC) | — | 180 | 24 Aug | ||
| Hillcrest Community Centre (Vancouver, BC) | — | 10 | 24 Aug | ||
| Cape Cod Mall (Hyannis, MA) | — | 10 | 23 Aug | ||
| CambridgeSide Garage Level (Cambridge, MA) | — | 10 | 23 Aug | ||
| AMC DINE-IN Framingham 16 (Framingham, MA) | — | 10 | 23 Aug | ||
| Northborough Crossing Wegmans (Northborough, MA) | — | 10 | 23 Aug | ||
| Connecticut Post Mall (Milford, CT) | — | 10 | 23 Aug | ||
| Broadway Commons (Hicksville, NY) | — | 10 | 23 Aug |