133
Sites
141
Avg peak power

See your own charging sessions

Link your Rivian account to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 23% B: 11% C: 13% D: 5% F: 4%

Sites

Average peak power and reliability grades are reported by Rivian.

C02184 North York EV

North York, ON

Operational Reliability C

146 kW avg peak

180 kW maximum

First tracked Jul 18, 2024

Port Orchard

PORT ORCHARD, WA

Operational Reliability C

141 kW avg peak

180 kW maximum

First tracked Aug 10, 2024

Queen City Center

Cumberland, MD

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 22, 2024

C45065 Toronto EV

Toronto, ON

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 22, 2024

CUT by Cinemark Frisco

Frisco, TX

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 23, 2024

C81612 YYC

Calgary, AB

Operational Reliability A

154 kW avg peak

180 kW maximum

First tracked Aug 25, 2024

Topgolf - Fort Worth

Fort Worth, TX

Unknown

Average peak power unavailable

10 kW maximum

First tracked Aug 28, 2024

Topgolf The Colony

The Colony, TX

Operational

Average peak power unavailable

10 kW maximum

First tracked Aug 28, 2024

Hearne TX

Hearne, TX

Operational Reliability A

115 kW avg peak

180 kW maximum

First tracked Sep 4, 2024

Las Vegas

Las Vegas, NV

Operational Reliability B

121 kW avg peak

180 kW maximum

First tracked Sep 6, 2024

E 461 E Washington St

North Attleboro, MA

Operational Reliability D

144 kW avg peak

180 kW maximum

First tracked Oct 9, 2024

1001 FM 1764

La Marque, TX

Operational Reliability A

122 kW avg peak

350 kW maximum

First tracked Oct 14, 2024

San Antonio TX- TPG

San Antonio, TX

Operational Reliability A

150 kW avg peak

350 kW maximum

First tracked Oct 27, 2024

525 Killingly St

JOHNSTON, RI

Operational Reliability C

147 kW avg peak

180 kW maximum

First tracked Oct 27, 2024

A Pacific Park

Glendale, CA

Unknown

Average peak power unavailable

10 kW maximum

First tracked Oct 28, 2024

10811 BOUDREAUX RD

TOMBALL, TX

Operational Reliability A

151 kW avg peak

350 kW maximum

First tracked Nov 24, 2024

110 E Louetta Unit A

Spring, TX

Operational Reliability B

135 kW avg peak

350 kW maximum

First tracked Dec 6, 2024

E 777 Cranston St

Cranston, RI

Operational Reliability D

159 kW avg peak

180 kW maximum

First tracked Dec 21, 2024

Page 3 of 7