Mercedes-Benz High-Power Charging
148
Sites
—
Avg kW
Reliability Distribution
Sites
Beasley, TX
400kW max
Peabody, MA
400kW max
Copley, OH
400kW max
Roseland, NJ
400kW max
Bridgewater, NJ
400kW max
Atlanta, GA
400kW max
Orlando, FL
400kW max
Fort Myers, FL
400kW max
North Fort Myers, FL
400kW max
Austin, TX
400kW max
Jonesboro, GA
400kW max
Bangor, ME
400kW max
St Johnsbury, VT
400kW max
Beasley, TX
400kW max
Phoenix, OR
400kW max
Braintree, MA
400kW max
Phoenix, OR
400kW max
Coquitlam, BC
400kW max
Tsawwassen, BC
400kW max
Lansing, MI
400kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| Chevron Beasley MB.HPC (Beasley, TX) | — | 400 | 25 Mar | ||
| TBD Peabody MB.HPC (Peabody, MA) | — | 400 | 19 Mar | ||
| TBD Copley MB.HPC (Copley, OH) | — | 400 | 18 Mar | ||
| TBD Roseland MB.HPC (Roseland, NJ) | — | 400 | 17 Mar | ||
| TBD Chimney Rock MB.HPC (Bridgewater, NJ) | — | 400 | 17 Mar | ||
| TBD Beacon MB.HPC (Atlanta, GA) | — | 400 | 17 Mar | ||
| Vineland Orlando MB.HPC (Orlando, FL) | — | 400 | 17 Mar | ||
| Fort Myers BW MB.HPC (Fort Myers, FL) | — | 400 | 17 Mar | ||
| Fort Myers MB.HPC (North Fort Myers, FL) | — | 400 | 17 Mar | ||
| TBD Austin City MB.HPC (Austin, TX) | — | 400 | 17 Mar | ||
| Shops at Tara MB.HPC (Jonesboro, GA) | — | 400 | 12 Mar | ||
| Bangor MB.HPC (Bangor, ME) | — | 400 | 01 Mar | ||
| St Johnsbury MB.HPC (St Johnsbury, VT) | — | 400 | 22 Feb | ||
| Chevron Beasley MB.HPC (Beasley, TX) | — | 400 | 19 Feb | ||
| Starbucks Phoenix MB.HPC (Phoenix, OR) | — | 400 | 19 Feb | ||
| Braintree MB.HPC (Braintree, MA) | — | 400 | 18 Feb | ||
| Phoenix, OR MB,HPC (Phoenix, OR) | — | 400 | 17 Feb | ||
| Sunwood Square MB.HPC (Coquitlam, BC) | — | 400 | 14 Feb | ||
| Tsawwassen Mills MB.HPC (Tsawwassen, BC) | — | 400 | 13 Feb | ||
| Eastwood Towne Center MB.HPC (Lansing, MI) | — | 400 | 13 Feb |