Pitt Meadows, BC
Average peak power unavailable
400 kW maximum
First tracked Oct 16, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Pitt Meadows, BC
Average peak power unavailable
400 kW maximum
First tracked Oct 16, 2026
Squamish, BC
Average peak power unavailable
400 kW maximum
First tracked Sep 22, 2026
Cary, NC
Average peak power unavailable
400 kW maximum
First tracked Aug 6, 2026
Southern Pines, NC
Average peak power unavailable
400 kW maximum
First tracked Aug 6, 2026
Charlotte, NC
Average peak power unavailable
400 kW maximum
First tracked Jun 30, 2026
Austin, TX
193 kW avg peak
400 kW maximum
First tracked Jun 30, 2026
Water, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 24, 2026
Long Beach, CA
Average peak power unavailable
400 kW maximum
First tracked Jun 24, 2026
Roseland, NJ
209 kW avg peak
400 kW maximum
First tracked Jun 24, 2026
Sunbury, OH
Average peak power unavailable
400 kW maximum
First tracked Jun 24, 2026
Nanaimo, BC
198 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Tsawwassen, BC
200 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Abbotsford, BC
193 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Coquitlam, BC
190 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Pentiction, BC
211 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Pitt Meadows, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Surrey, BC
207 kW avg peak
400 kW maximum
First tracked Jun 22, 2026
Salt Lake City, UT
Average peak power unavailable
11 kW maximum
First tracked Jun 19, 2026
Tempe, AZ
211 kW avg peak
400 kW maximum
First tracked Jun 16, 2026
Estero, FL
Average peak power unavailable
400 kW maximum
First tracked Jun 11, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
2 Meadow Vale Shopping Centre MB.HPC
Pitt Meadows, BC
Operational First tracked Oct 16, 2026 |
Operational | — | 400 kW | Oct 16, 2026 |
|
Squamish MB.HPC
Squamish, BC
Operational First tracked Sep 22, 2026 |
Operational | — | 400 kW | Sep 22, 2026 |
|
Parkside Town Commons Cary MB.HPC
Cary, NC
Operational First tracked Aug 6, 2026 |
Operational | — | 400 kW | Aug 6, 2026 |
|
Café Boku at the Barn MP.HPC
Southern Pines, NC
Unknown First tracked Aug 6, 2026 |
Unknown | — | 400 kW | Aug 6, 2026 |
|
Charlotte Premium Outlets MB.HPC
Charlotte, NC
Operational First tracked Jun 30, 2026 |
Operational | — | 400 kW | Jun 30, 2026 |
|
Austin - The Domain MB.HPC
Austin, TX Reliability A Operational First tracked Jun 30, 2026 |
Operational | 193 kW | 400 kW | Jun 30, 2026 |
|
NOT FOR PUBLIC USE - TEST LAB
Water, BC
Operational First tracked Jun 24, 2026 |
Operational | — | 400 kW | Jun 24, 2026 |
|
NOT FOR PUBLIC USE - TEST LAB
Long Beach, CA
Operational First tracked Jun 24, 2026 |
Operational | — | 400 kW | Jun 24, 2026 |
|
Roseland MB.HPC
Roseland, NJ Reliability A Operational First tracked Jun 24, 2026 |
Operational | 209 kW | 400 kW | Jun 24, 2026 |
|
Columbus MB.HPC
Sunbury, OH
Operational First tracked Jun 24, 2026 |
Operational | — | 400 kW | Jun 24, 2026 |
|
Woodgrove Shopping Centre MB.HPC
Nanaimo, BC Reliability B Operational First tracked Jun 22, 2026 |
Operational | 198 kW | 400 kW | Jun 22, 2026 |
|
Tsawwassen Mills MB.HPC
Tsawwassen, BC Reliability B Operational First tracked Jun 22, 2026 |
Operational | 200 kW | 400 kW | Jun 22, 2026 |
|
Abbotsford Power Centre MB.HPC
Abbotsford, BC Reliability C Operational First tracked Jun 22, 2026 |
Operational | 193 kW | 400 kW | Jun 22, 2026 |
|
Sunwood Square MB.HPC
Coquitlam, BC Reliability B Operational First tracked Jun 22, 2026 |
Operational | 190 kW | 400 kW | Jun 22, 2026 |
|
Penticton Lakeside Hotel MB.HPC
Pentiction, BC Reliability C Operational First tracked Jun 22, 2026 |
Operational | 211 kW | 400 kW | Jun 22, 2026 |
|
Meadow Vale Shopping Centre MB.HPC
Pitt Meadows, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Panorama Village Surrey MB.HPC
Surrey, BC Reliability C Operational First tracked Jun 22, 2026 |
Operational | 207 kW | 400 kW | Jun 22, 2026 |
|
Chargepoint Test Location
Salt Lake City, UT
Unknown First tracked Jun 19, 2026 |
Unknown | — | 11 kW | Jun 19, 2026 |
|
Tempe Marketplace
Tempe, AZ Reliability A Operational First tracked Jun 16, 2026 |
Operational | 211 kW | 400 kW | Jun 16, 2026 |
|
Coconut Point Mall Estero MB.HPC
Estero, FL
Operational First tracked Jun 11, 2026 |
Operational | — | 400 kW | Jun 11, 2026 |