Mercedes-Benz High-Power Charging
75
Sites
—
Avg kW
Reliability Distribution
Sites
Hyannis, MA
400kW max
Clinton, CT
400kW max
Red Bluff, CA
400kW max
Phoenix, OR
400kW max
Washington, PA
400kW max
Copley, OH
400kW max
Lee, MA
400kW max
Kittery, ME
400kW max
Peabody, MA
400kW max
Saco, ME
400kW max
Holyoke, MA
400kW max
Braintree, MA
400kW max
Methuen, MA
400kW max
Manchester, NH
400kW max
Ridgefield, WA
400kW max
Lansing, MI
400kW max
Elmira, NY
400kW max
Bangor, ME
400kW max
St Johnsbury, VT
400kW max
Orlando, FL
400kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| Cape Cod Mall MB.HPC (Hyannis, MA) | — | 400 | 26 Mar | ||
| Clinton Premium Outlets MB.HPC (Clinton, CT) | — | 400 | 26 Mar | ||
| Starbucks Red Bluff MB.HPC (Red Bluff, CA) | — | 400 | 26 Mar | ||
| Starbucks Phoenix MB.HPC (Phoenix, OR) | — | 400 | 26 Mar | ||
| The Old Mill Washington MB.HPC (Washington, PA) | — | 400 | 26 Mar | ||
| Copley MB.HPC (Copley, OH) | — | 400 | 26 Mar | ||
| Lee Premium Outlets MB.HPC (Lee, MA) | — | 400 | 26 Mar | ||
| Kittery Premium Outlets MB.HPC (Kittery, ME) | — | 400 | 26 Mar | ||
| TBD Peabody MB.HPC (Peabody, MA) | — | 400 | 26 Mar | ||
| Industrial Park Saco MB.HPC (Saco, ME) | — | 400 | 26 Mar | ||
| Holyoke MB.HPC (Holyoke, MA) | — | 400 | 26 Mar | ||
| Braintree MB.HPC (Braintree, MA) | — | 400 | 26 Mar | ||
| Methuen MB.HPC (Methuen, MA) | — | 400 | 26 Mar | ||
| The Mall of New Hampshire MB.HPC (Manchester, NH) | — | 400 | 26 Mar | ||
| Starbucks Ridgefield MB.HPC (Ridgefield, WA) | — | 400 | 26 Mar | ||
| Eastwood Towne Center MB.HPC (Lansing, MI) | — | 400 | 28 Mar | ||
| Elmira MB.HPC (Elmira, NY) | — | 400 | 28 Mar | ||
| Bangor MB.HPC (Bangor, ME) | — | 400 | 28 Mar | ||
| St Johnsbury MB.HPC (St Johnsbury, VT) | — | 400 | 28 Mar | ||
| Orlando Lake Nona MP.HPC (Orlando, FL) | — | 400 | 13 Apr |