474
Sites
—
Avg peak power

See your own charging sessions

Link your Rivian account to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution

Sites

Average peak power and reliability grades are reported by Rivian.

Honda Huntersville

Huntersville, NC

Unknown

Average peak power unavailable

60 kW maximum

First tracked Sep 18, 2026

INC1001962 JitneyEV LLC

Chicago, IL

Unknown

Average peak power unavailable

60 kW maximum

First tracked Sep 11, 2026

Truro Volkswagen

Truro, NS

Operational

Average peak power unavailable

25 kW maximum

First tracked Aug 1, 2026

Frenchie's Chevrolet Inc

Massena, NY

Operational

Average peak power unavailable

180 kW maximum

First tracked Aug 1, 2026

Page 1 of 24