Brampton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Brampton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
100 kW maximum
First tracked Jul 28, 2026
Brampton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Brampton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Etobicoke, ON
Average peak power unavailable
45 kW maximum
First tracked Jul 28, 2026
Waterloo, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Etobicoke, ON
Average peak power unavailable
45 kW maximum
First tracked Jul 28, 2026
Waterloo, ON
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
London, ON
Average peak power unavailable
7 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
London, ON
Average peak power unavailable
45 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
MISSISSAUGA, ON
Average peak power unavailable
100 kW maximum
First tracked Jul 28, 2026
Milton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Brampton, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
45 kW maximum
First tracked Jul 28, 2026
Toronto, ON
Average peak power unavailable
50 kW maximum
First tracked Jul 28, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
AAC-00057 10 Peel Centre Drive - Suite A
Brampton, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAK-01577 Honda Queensway - DC
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 100 kW | Jul 28, 2026 |
|
AAL-01662 RCCG Anointed Chapel - Brampton
Brampton, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAL-01734 Ampower Electric
Brampton, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAP-01804 GreenP - CP82 - 9 Emerson Ave - Fast Charger
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAL-01017 AURA Humberwood
Etobicoke, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 45 kW | Jul 28, 2026 |
|
AAC-00064 University of Waterloo
Waterloo, ON
Unknown First tracked Jul 28, 2026 |
Unknown | — | 50 kW | Jul 28, 2026 |
|
AAL-01012 AURA Humberwood
Etobicoke, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 45 kW | Jul 28, 2026 |
|
T30001L-2#A2 Canadian Tire - Waterloo
Waterloo, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 320 kW | Jul 28, 2026 |
|
AAP-01797 GreenP - CP41 - 7 Norton Ave - Fast Charger
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
T300028-1#A1 Metro - London Westwood
London, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 7 kW | Jul 28, 2026 |
|
AAP-01794 GreenP - CP650 - 16 John St - Fast Charger
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAL-00809 AURA London
London, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 45 kW | Jul 28, 2026 |
|
AAL-00785 GreenP - CP36 - 110 Queen St W. - Fast Chargers
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAC-00100 FLO - Cadillac Fairview - Toronto Eaton Centre
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAK-00535 Nissan Canada Headquarters | Fast Charger
MISSISSAUGA, ON
Unknown First tracked Jul 28, 2026 |
Unknown | — | 100 kW | Jul 28, 2026 |
|
AAL-00609 Wallace Cadillac - Fast Charger
Milton, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |
|
AAL-01542 OpenRoad Honda - SmartDC
Brampton, ON
Unknown First tracked Jul 28, 2026 |
Unknown | — | 50 kW | Jul 28, 2026 |
|
AAL-00795 AURA Lake Shore BLVD
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 45 kW | Jul 28, 2026 |
|
AAP-01801 GreenP - CP44 - 14 Fuller Ave - Fast Charger
Toronto, ON
Operational First tracked Jul 28, 2026 |
Operational | — | 50 kW | Jul 28, 2026 |