Arlington, WA
Operational
Average peak power unavailable
200 kW maximum
First tracked Sep 30, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Arlington, WA
Average peak power unavailable
200 kW maximum
First tracked Sep 30, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
Electric Era Charging Station
Arlington, WA
Operational First tracked Sep 30, 2026 |
Operational | — | 200 kW | Sep 30, 2026 |