Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Verdun, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Repentigny, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Varennes, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Laval, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Bois-des-Filion, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Hawkesbury, ON
Average peak power unavailable
50 kW maximum
First tracked Dec 6, 2024
Arundel, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Saint-Émile-de-Suffolk, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Lac-Supérieur, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Chénéville, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Lac Simon, QC
Average peak power unavailable
6 kW maximum
First tracked Dec 6, 2024
Mont-Tremblant, QC
Average peak power unavailable
7 kW maximum
First tracked Dec 6, 2024
Val-des-Monts, QC
Average peak power unavailable
19 kW maximum
First tracked Dec 6, 2024
Wakefield, QC
Average peak power unavailable
19 kW maximum
First tracked Dec 6, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
17020 | BSR | VER | 1105 De L'église
Montréal, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
16041 | BBHR | LAS | 707 75e av - Aréna Dollard St-Laurent
Montréal, QC
Unknown First tracked Dec 6, 2024 |
Unknown | — | 7 kW | Dec 6, 2024 |
|
17018 | BSR | VER | 97 Rue de l'Église
Verdun, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
16021 | BSR | LAS | 8320 Centrale
Montréal, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 7 kW | Dec 6, 2024 |
|
METRO - Repentigny
Repentigny, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 7 kW | Dec 6, 2024 |
|
Varennes - Parc de la Commune
Varennes, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
1958 42e
Montréal, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 7 kW | Dec 6, 2024 |
|
9081 | BBHR | RDP-PAT | 12125 Notre-Dame E : Centre communautaire Roussin
Montréal, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
14022 | BSR | SLA | 4747 Bourg
Montréal, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
CEA-10105 St-Hubert - Fabreville
Laval, QC
Unknown First tracked Dec 6, 2024 |
Unknown | — | 6 kW | Dec 6, 2024 |
|
Hôtel de Ville
Bois-des-Filion, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
DCFC - Hawkesbury
Hawkesbury, ON
Operational First tracked Dec 6, 2024 |
Operational | — | 50 kW | Dec 6, 2024 |
|
Golf Arundel
Arundel, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 7 kW | Dec 6, 2024 |
|
CEA-10181 St-Émile-de-Suffolk - Hôtel de Ville
Saint-Émile-de-Suffolk, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
Halte municipale
Lac-Supérieur, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
CEA-10305 Chénéville - Parc DoRéMi
Chénéville, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
CEA-10401 Lac Simon - Hôtel de ville
Lac Simon, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 6 kW | Dec 6, 2024 |
|
CEB-10133 Fairmont Château Tremblant
Mont-Tremblant, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 7 kW | Dec 6, 2024 |
|
CEJ-01351 HOM Mini Chalets
Val-des-Monts, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 19 kW | Dec 6, 2024 |
|
Parc Nature Éco-Odyssée
Wakefield, QC
Operational First tracked Dec 6, 2024 |
Operational | — | 19 kW | Dec 6, 2024 |