Grand Island, NY
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Grand Island, NY
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Grand Island, NY
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Rochester, NY
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Rochester, NY
Average peak power unavailable
320 kW maximum
First tracked Jul 28, 2026
Miami, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 30, 2026
Cape Coral, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 30, 2026
Lake Worth, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 30, 2026
Miami, FL
Average peak power unavailable
41 kW maximum
First tracked Jul 30, 2026
Norfolk, VA
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
City of Industry, CA
Average peak power unavailable
121 kW maximum
First tracked Jul 31, 2026
East Brunswick, NJ
Average peak power unavailable
240 kW maximum
First tracked Jul 31, 2026
Parsippany, NJ
Average peak power unavailable
121 kW maximum
First tracked Jul 31, 2026
Great Neck, NY
Average peak power unavailable
240 kW maximum
First tracked Jul 31, 2026
Rutherford, NJ
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
Bronx, NY
Average peak power unavailable
121 kW maximum
First tracked Jul 31, 2026
North Miami Beach, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
Fort Pierce, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
Hollywood, FL
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
Chesapeake, VA
Average peak power unavailable
181 kW maximum
First tracked Jul 31, 2026
Evansville, IN
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
GRANDISLAND-A ChargeSmart EV - Grand Island
Grand Island, NY
Operational First tracked Jul 28, 2026 |
Operational | — | 320 kW | Jul 28, 2026 |
|
GRANDISLAND-B ChargeSmart EV - Grand Island
Grand Island, NY
Operational First tracked Jul 28, 2026 |
Operational | — | 320 kW | Jul 28, 2026 |
|
GREECE-A ChargeSmart EV - Greece
Rochester, NY
Operational First tracked Jul 28, 2026 |
Operational | — | 320 kW | Jul 28, 2026 |
|
GREECE-B ChargeSmart EV - Greece
Rochester, NY
Operational First tracked Jul 28, 2026 |
Operational | — | 320 kW | Jul 28, 2026 |
|
Kendall CDJR
Miami, FL
Operational First tracked Jul 30, 2026 |
Operational | — | 181 kW | Jul 30, 2026 |
|
Cape Coral CDJR
Cape Coral, FL
Operational First tracked Jul 30, 2026 |
Operational | — | 181 kW | Jul 30, 2026 |
|
Wayne Akers Ford
Lake Worth, FL
Operational First tracked Jul 30, 2026 |
Operational | — | 181 kW | Jul 30, 2026 |
|
South Dade Kia
Miami, FL
Operational First tracked Jul 30, 2026 |
Operational | — | 41 kW | Jul 30, 2026 |
|
Southern CDJR - Norfolk
Norfolk, VA
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
CSEV-ADC0075 Chevrolet of Puente Hills
City of Industry, CA
Operational First tracked Jul 31, 2026 |
Operational | — | 121 kW | Jul 31, 2026 |
|
ChargeSmart EV - Old Bridge Turnpike
East Brunswick, NJ
Operational First tracked Jul 31, 2026 |
Operational | — | 240 kW | Jul 31, 2026 |
|
6 Paul Miller Toyota
Parsippany, NJ
Operational First tracked Jul 31, 2026 |
Operational | — | 121 kW | Jul 31, 2026 |
|
Biener Ford - Great Neck
Great Neck, NY
Operational First tracked Jul 31, 2026 |
Operational | — | 240 kW | Jul 31, 2026 |
|
Quality Auto Mall
Rutherford, NJ
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
City World Ford Showroom
Bronx, NY
Operational First tracked Jul 31, 2026 |
Operational | — | 121 kW | Jul 31, 2026 |
|
Aventura CJDR
North Miami Beach, FL
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
Sunrise Ford
Fort Pierce, FL
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
Hollywood CJ-Dodge
Hollywood, FL
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
Southern CDJR - Greenbrier
Chesapeake, VA
Operational First tracked Jul 31, 2026 |
Operational | — | 181 kW | Jul 31, 2026 |
|
CSEV-ADC0040 D-Patrick Ford - Evansville
Evansville, IN
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |