Birmingham, AL
85 kW avg peak
125 kW maximum
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Birmingham, AL
85 kW avg peak
125 kW maximum
Birmingham, AL
Average peak power unavailable
19 kW maximum
Birmingham, AL
Average peak power unavailable
7 kW maximum
Birmingham, AL
Average peak power unavailable
7 kW maximum
Birmingham, AL
Average peak power unavailable
7 kW maximum
Irondale, AL
Average peak power unavailable
63 kW maximum
Tuscaloosa, AL
Average peak power unavailable
12 kW maximum
Tuscaloosa, AL
Average peak power unavailable
63 kW maximum
Tuscaloosa, AL
Average peak power unavailable
7 kW maximum
Cullman, AL
101 kW avg peak
125 kW maximum
Cullman, AL
Average peak power unavailable
7 kW maximum
Cullman, AL
Average peak power unavailable
7 kW maximum
Cullman, AL
Average peak power unavailable
7 kW maximum
Cullman, AL
Average peak power unavailable
7 kW maximum
Madison, AL
Average peak power unavailable
7 kW maximum
Huntsville, AL
Average peak power unavailable
7 kW maximum
Huntsville, AL
Average peak power unavailable
7 kW maximum
Madison, AL
Average peak power unavailable
7 kW maximum
Madison, AL
Average peak power unavailable
7 kW maximum
Hartselle, AL
85 kW avg peak
125 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
HALLMARK HYU H S R
Birmingham, AL Reliability C Operational |
Operational | 85 kW | 125 kW | — |
|
THE HUB CDC
Birmingham, AL
Operational |
Operational | — | 19 kW | — |
|
UAB EXPRESS LOT 4
Birmingham, AL
Operational |
Operational | — | 7 kW | — |
|
UAB 17TH ST #1
Birmingham, AL
Operational |
Operational | — | 7 kW | — |
|
UAB COMM HLTH BLDG
Birmingham, AL
Operational |
Operational | — | 7 kW | — |
|
MBBHM
Irondale, AL
Operational |
Operational | — | 63 kW | — |
|
BMWOFTUSCALOOSA
Tuscaloosa, AL
Operational |
Operational | — | 12 kW | — |
|
TUSC HYUNDAI LEVEL 3
Tuscaloosa, AL
Operational |
Operational | — | 63 kW | — |
|
BPT CHARGER BEACON PLACE
Tuscaloosa, AL
Operational |
Operational | — | 7 kW | — |
|
CULLMANELECTRIC STATION
Cullman, AL Reliability A Operational |
Operational | 101 kW | 125 kW | — |
|
CULLMANELECTRIC CEC MAIN OFFICE
Cullman, AL
Operational |
Operational | — | 7 kW | — |
|
CRMC CRMC-2- L2RIGHT
Cullman, AL
Operational |
Operational | — | 7 kW | — |
|
CRMC CRMC-1 - L2LEFT
Cullman, AL
Operational |
Operational | — | 7 kW | — |
|
CULLMAN PB STATION 1
Cullman, AL
Operational |
Operational | — | 7 kW | — |
|
HENRY HOUSE BUILDING
Madison, AL
Operational |
Operational | — | 7 kW | — |
|
CAPITAL PARK CAPITAL PARK 72
Huntsville, AL
Operational |
Operational | — | 7 kW | — |
|
FS LEXUS LEX HSV 1
Huntsville, AL
Operational |
Operational | — | 7 kW | — |
|
THE DEMPSEY
Madison, AL
Operational |
Operational | — | 7 kW | — |
|
SRS EV TOWN MADISON
Madison, AL
Operational |
Operational | — | 7 kW | — |
|
HARTSELLE 1 STATION
Hartselle, AL Reliability A Operational |
Operational | 85 kW | 125 kW | — |