La Mesa, CA
Average peak power unavailable
10 kW maximum
First tracked Jan 10, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
La Mesa, CA
Average peak power unavailable
10 kW maximum
First tracked Jan 10, 2026
Rockwall, TX
Average peak power unavailable
40 kW maximum
First tracked Jan 9, 2026
Rockwall, TX
Average peak power unavailable
19 kW maximum
First tracked Jan 9, 2026
Escondido, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 9, 2026
Springfield, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 9, 2026
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 9, 2026
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 9, 2026
Chicago, IL
Average peak power unavailable
4 kW maximum
First tracked Jan 9, 2026
Idaho Falls, ID
122 kW avg peak
350 kW maximum
First tracked Jan 9, 2026
Pittsburg, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 9, 2026
Adairsville, GA
Average peak power unavailable
4 kW maximum
First tracked Jan 9, 2026
Bell, CA
Average peak power unavailable
125 kW maximum
First tracked Jan 9, 2026
Wrightsville, GA
Average peak power unavailable
500 kW maximum
First tracked Jan 8, 2026
Auburn, IN
Average peak power unavailable
19 kW maximum
First tracked Jan 8, 2026
Barnstable, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 8, 2026
Saint-Eustache, QC
Average peak power unavailable
125 kW maximum
First tracked Jan 8, 2026
Port Townsend, WA
Average peak power unavailable
7 kW maximum
First tracked Jan 8, 2026
Troutdale, OR
Average peak power unavailable
12 kW maximum
First tracked Jan 8, 2026
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 8, 2026
Lowell, MA
Average peak power unavailable
7 kW maximum
First tracked Jan 8, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
LOCKHEED SPACE B352-EV7
La Mesa, CA
Unknown First tracked Jan 10, 2026 |
Unknown | — | 10 kW | Jan 10, 2026 |
|
ROCKWALL CDJR PWRLNK2000-1
Rockwall, TX
Unknown First tracked Jan 9, 2026 |
Unknown | — | 40 kW | Jan 9, 2026 |
|
ROCKWALL CDJR CP6000
Rockwall, TX
Operational First tracked Jan 9, 2026 |
Operational | — | 19 kW | Jan 9, 2026 |
|
EFCC EV
Escondido, CA
Operational First tracked Jan 9, 2026 |
Operational | — | 7 kW | Jan 9, 2026 |
|
RETAIL LOT STATION1
Springfield, MA
Operational First tracked Jan 9, 2026 |
Operational | — | 7 kW | Jan 9, 2026 |
|
PUBLIC GARDEN 2D12
Boston, MA
Operational First tracked Jan 9, 2026 |
Operational | — | 7 kW | Jan 9, 2026 |
|
PUBLIC GARDEN 2
Boston, MA
Operational First tracked Jan 9, 2026 |
Operational | — | 7 kW | Jan 9, 2026 |
|
1KWW LEVEL A - A36
Chicago, IL
Operational First tracked Jan 9, 2026 |
Operational | — | 4 kW | Jan 9, 2026 |
|
L330 PL-IF-PUBLIC 02
Idaho Falls, ID Reliability C Operational First tracked Jan 9, 2026 |
Operational | 122 kW | 350 kW | Jan 9, 2026 |
|
4CD LMC LOT A STN10
Pittsburg, CA
Operational First tracked Jan 9, 2026 |
Operational | — | 7 kW | Jan 9, 2026 |
|
HAMPTON ADAIRSV STATION
Adairsville, GA
Operational First tracked Jan 9, 2026 |
Operational | — | 4 kW | Jan 9, 2026 |
|
IN-N-OUT ATLANTIC 0
Bell, CA
Operational First tracked Jan 9, 2026 |
Operational | — | 125 kW | Jan 9, 2026 |
|
GEORGIA POWER WRIGHTSVILLEDC
Wrightsville, GA
Operational First tracked Jan 8, 2026 |
Operational | — | 500 kW | Jan 8, 2026 |
|
DMF STATION 1 DEKALB METAL
Auburn, IN
Operational First tracked Jan 8, 2026 |
Operational | — | 19 kW | Jan 8, 2026 |
|
COUNTY COMPLEX RECYCLE SHED
Barnstable, MA
Operational First tracked Jan 8, 2026 |
Operational | — | 7 kW | Jan 8, 2026 |
|
RECHARGECO ST-EUSTACHE 0
Saint-Eustache, QC
Operational First tracked Jan 8, 2026 |
Operational | — | 125 kW | Jan 8, 2026 |
|
WEST HARBOR 6
Port Townsend, WA
Operational First tracked Jan 8, 2026 |
Operational | — | 7 kW | Jan 8, 2026 |
|
EDGEWOOD APTS EASTWOOD
Troutdale, OR
Operational First tracked Jan 8, 2026 |
Operational | — | 12 kW | Jan 8, 2026 |
|
MASPARC COLUMBUS 1
Boston, MA
Operational First tracked Jan 8, 2026 |
Operational | — | 7 kW | Jan 8, 2026 |
|
EAST LOT 1 CRC
Lowell, MA
Operational First tracked Jan 8, 2026 |
Operational | — | 7 kW | Jan 8, 2026 |