San Diego, CA
Average peak power unavailable
19 kW maximum
First tracked Jan 22, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
San Diego, CA
Average peak power unavailable
19 kW maximum
First tracked Jan 22, 2026
Coquitlam, BC
Average peak power unavailable
8 kW maximum
First tracked Jan 22, 2026
Gardiner, ME
Average peak power unavailable
6 kW maximum
First tracked Jan 22, 2026
Coquitlam, BC
Average peak power unavailable
8 kW maximum
First tracked Jan 22, 2026
Pittsburgh, PA
Average peak power unavailable
12 kW maximum
First tracked Jan 22, 2026
Glendale, CA
Average peak power unavailable
12 kW maximum
First tracked Jan 22, 2026
Puyallup, WA
Average peak power unavailable
13 kW maximum
First tracked Jan 22, 2026
Boston, MA
Average peak power unavailable
12 kW maximum
First tracked Jan 22, 2026
Boston, MA
Average peak power unavailable
12 kW maximum
First tracked Jan 22, 2026
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jan 22, 2026
Washington, NJ
Average peak power unavailable
7 kW maximum
First tracked Jan 22, 2026
Patchogue, NY
Average peak power unavailable
7 kW maximum
First tracked Jan 22, 2026
Greensburg, IN
Average peak power unavailable
7 kW maximum
First tracked Jan 21, 2026
Golden, CO
Average peak power unavailable
19 kW maximum
First tracked Jan 21, 2026
Mountain City, TN
Average peak power unavailable
80 kW maximum
First tracked Jan 21, 2026
Tijeras, NM
Average peak power unavailable
19 kW maximum
First tracked Jan 21, 2026
Litchfield Park, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 21, 2026
Katy, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 21, 2026
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Jan 21, 2026
Salt Lake City, UT
Average peak power unavailable
7 kW maximum
First tracked Jan 21, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
DGS GBD
San Diego, CA
Operational First tracked Jan 22, 2026 |
Operational | — | 19 kW | Jan 22, 2026 |
|
MV_PUBLIC COLONY FARM 2
Coquitlam, BC
Operational First tracked Jan 22, 2026 |
Operational | — | 8 kW | Jan 22, 2026 |
|
GARDINER STATION
Gardiner, ME
Operational First tracked Jan 22, 2026 |
Operational | — | 6 kW | Jan 22, 2026 |
|
MV_PUBLIC COLONY FARM 1
Coquitlam, BC
Operational First tracked Jan 22, 2026 |
Operational | — | 8 kW | Jan 22, 2026 |
|
GRACELAND GRACELAND
Pittsburgh, PA
Unknown First tracked Jan 22, 2026 |
Unknown | — | 12 kW | Jan 22, 2026 |
|
VV APTS
Glendale, CA
Unknown First tracked Jan 22, 2026 |
Unknown | — | 12 kW | Jan 22, 2026 |
|
PUYALLUP STATION
Puyallup, WA
Operational First tracked Jan 22, 2026 |
Operational | — | 13 kW | Jan 22, 2026 |
|
ST GABRIELS EV
Boston, MA
Operational First tracked Jan 22, 2026 |
Operational | — | 12 kW | Jan 22, 2026 |
|
ST GABRIELS EV1-2
Boston, MA
Operational First tracked Jan 22, 2026 |
Operational | — | 12 kW | Jan 22, 2026 |
|
HOWARD COUNTY ASCEND 1 FLEET
Columbia, MD
Unknown First tracked Jan 22, 2026 |
Unknown | — | 7 kW | Jan 22, 2026 |
|
WASHINGTON BID WASHINGTON PS1
Washington, NJ
Operational First tracked Jan 22, 2026 |
Operational | — | 7 kW | Jan 22, 2026 |
|
GPM GROVE
Patchogue, NY
Operational First tracked Jan 22, 2026 |
Operational | — | 7 kW | Jan 22, 2026 |
|
DCMH REHAB BASE #2
Greensburg, IN
Operational First tracked Jan 21, 2026 |
Operational | — | 7 kW | Jan 21, 2026 |
|
OPEN SPACE LMNC STATION
Golden, CO
Operational First tracked Jan 21, 2026 |
Operational | — | 19 kW | Jan 21, 2026 |
|
GPM INVESTMENTS 3416 DC
Mountain City, TN
Operational First tracked Jan 21, 2026 |
Operational | — | 80 kW | Jan 21, 2026 |
|
BERNALILLO CO. LOS VECINOS
Tijeras, NM
Operational First tracked Jan 21, 2026 |
Operational | — | 19 kW | Jan 21, 2026 |
|
VILLASLITCHFIEL
Litchfield Park, AZ
Operational First tracked Jan 21, 2026 |
Operational | — | 7 kW | Jan 21, 2026 |
|
KRC OFFICES LOFTS
Katy, TX
Operational First tracked Jan 21, 2026 |
Operational | — | 7 kW | Jan 21, 2026 |
|
TIMBERGROVE
Houston, TX
Operational First tracked Jan 21, 2026 |
Operational | — | 7 kW | Jan 21, 2026 |
|
CAPITOL NORTHCAP
Salt Lake City, UT
Operational First tracked Jan 21, 2026 |
Operational | — | 7 kW | Jan 21, 2026 |