Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Feb 1, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Feb 1, 2026
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Feb 1, 2026
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Manitouwadge, ON
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Vancouver, BC
Average peak power unavailable
10 kW maximum
First tracked Jan 31, 2026
Sechelt, BC
Average peak power unavailable
10 kW maximum
First tracked Jan 31, 2026
Coquitlam, BC
Average peak power unavailable
19 kW maximum
First tracked Jan 31, 2026
Yarmouth, NS
Average peak power unavailable
13 kW maximum
First tracked Jan 31, 2026
Londonderry, NH
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Londonderry, NH
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Detroit, MI
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Sacramento, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 31, 2026
Moreno Valley, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Boynton Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Boynton Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Malta, NY
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Manchester, VT
Average peak power unavailable
4 kW maximum
First tracked Jan 30, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
DPS NORTH 1
Denver, CO
Operational First tracked Feb 1, 2026 |
Operational | — | 7 kW | Feb 1, 2026 |
|
DPS LINCOLN 2
Denver, CO
Operational First tracked Feb 1, 2026 |
Operational | — | 7 kW | Feb 1, 2026 |
|
HHC COLUMBIA MOB- STATION 23
Columbia, MD
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
EEPAAS INFINITY_NAVAJO
Denver, CO
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
MANITOUWADGE ARENA LEFT CHRG
Manitouwadge, ON
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
DISTRICT MAIN P1
Vancouver, BC
Operational First tracked Jan 31, 2026 |
Operational | — | 10 kW | Jan 31, 2026 |
|
SECHELT OPS CENTER
Sechelt, BC
Operational First tracked Jan 31, 2026 |
Operational | — | 10 kW | Jan 31, 2026 |
|
CLARKE & COMO P1
Coquitlam, BC
Operational First tracked Jan 31, 2026 |
Operational | — | 19 kW | Jan 31, 2026 |
|
TUSKET TOYOTA CP6000
Yarmouth, NS
Operational First tracked Jan 31, 2026 |
Operational | — | 13 kW | Jan 31, 2026 |
|
EFINH STATION 1
Londonderry, NH
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
EFINH STATION 2
Londonderry, NH
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
BEDROCK HU
Detroit, MI
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
UC DAVIS HEALTH PS2, STATION 1
Sacramento, CA
Operational First tracked Jan 31, 2026 |
Operational | — | 7 kW | Jan 31, 2026 |
|
CITY HALL CORPORATE YARD6
Moreno Valley, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
WSL SOUTH CONGR STATION 1 BLD 2
Boynton Beach, FL
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
WSL SOUTH CONGR STATION 5 BLD 1
Boynton Beach, FL
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
CFA 05676 CFA #05676 1
Tucson, AZ
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
CFA 05676 CFA #05676
Tucson, AZ
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
GLOBALFOUNDRIES GF 1
Malta, NY
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
POOL AREA STATION
Manchester, VT
Operational First tracked Jan 30, 2026 |
Operational | — | 4 kW | Jan 30, 2026 |