ChargePoint
B+30,473
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Canton, GA
7kW max
Canton, GA
7kW max
Columbus, GA
7kW max
Chicago, IL
7kW max
Libertyville, IL
75kW avg
63kW max
Delavan, WI
7kW max
Little Rock, AR
7kW max
Little Rock, AR
7kW max
Katy, TX
12kW max
Austin, TX
7kW max
Austin, TX
7kW max
Los Alamos, NM
66kW avg
63kW max
Milan, NM
91kW avg
63kW max
Waddell, AZ
7kW max
San Diego, CA
19kW max
San Diego, CA
19kW max
Vista, CA
7kW max
Oceanside, CA
7kW max
Bakersfield, CA
7kW max
Roseville, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| NORTHSIDE EV NORTHSIDE EV (Canton, GA) | — | 7 | 02 Jun | ||
| NORTHSIDE EV NORTHSIDE EV3 (Canton, GA) | — | 7 | 02 Jun | ||
| JMC EV 1 MC 1 (Columbus, GA) | — | 7 | 02 Jun | ||
| PARK BOULEVARD 3B-SOUTH (Chicago, IL) | — | 7 | 02 Jun | ||
| A | LIBVL CHEVROLET C (Libertyville, IL) | 75 | 63 | 02 Jun | |
| 123 S SECOND MUNICIPAL BLDG (Delavan, WI) | — | 7 | 02 Jun | ||
| CITY-LITTLEROCK NWPD (Little Rock, AR) | — | 7 | 02 Jun | ||
| CITY-LITTLEROCK REBSAMEN GOLF (Little Rock, AR) | — | 7 | 02 Jun | ||
| KATY CROSSING OHT (Katy, TX) | — | 12 | 02 Jun | ||
| AMD GO GREEN MET (Austin, TX) | — | 7 | 02 Jun | ||
| 1801 E 6TH LEVEL 2 (Austin, TX) | — | 7 | 02 Jun | ||
| A | LAC DPU LOS ALAMOS MUNI (Los Alamos, NM) | 66 | 63 | 02 Jun | |
| A | MILAN NMDOT6 EV (Milan, NM) | 91 | 63 | 02 Jun | |
| BALL 1,2,3 EV (Waddell, AZ) | — | 7 | 02 Jun | ||
| SOLV ENERGY (San Diego, CA) | — | 19 | 02 Jun | ||
| SOLV ENERGY EV(#4 & #5 (San Diego, CA) | — | 19 | 02 Jun | ||
| EV VILLAT LAKE VALETERRACE0 (Vista, CA) | — | 7 | 02 Jun | ||
| MIRACOSTA EV (Oceanside, CA) | — | 7 | 02 Jun | ||
| CALIFIA CALIFIA (Bakersfield, CA) | — | 7 | 02 Jun | ||
| ROSEVILLE ROS CHARGER (Roseville, CA) | — | 7 | 02 Jun |