Windsor, ON
Average peak power unavailable
12 kW maximum
First tracked Mar 9, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Windsor, ON
Average peak power unavailable
12 kW maximum
First tracked Mar 9, 2026
Windsor, ON
Average peak power unavailable
12 kW maximum
First tracked Mar 9, 2026
Barnstable, MA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Goodyear, AZ
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Forest Lake, MN
Average peak power unavailable
12 kW maximum
First tracked Mar 7, 2026
Perrysburg, OH
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Orange, CA
Average peak power unavailable
8 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
San Luis Obispo, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Oak Grove, KY
Average peak power unavailable
4 kW maximum
First tracked Mar 6, 2026
Cartersville, GA
Average peak power unavailable
7 kW maximum
First tracked Mar 6, 2026
Sunnyvale, CA
Average peak power unavailable
12 kW maximum
First tracked Mar 6, 2026
Lincoln, ON
Average peak power unavailable
8 kW maximum
First tracked Mar 6, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
NEXTSTAR
Windsor, ON
Operational First tracked Mar 9, 2026 |
Operational | — | 12 kW | Mar 9, 2026 |
|
NEXTSTAR C-38
Windsor, ON
Operational First tracked Mar 9, 2026 |
Operational | — | 12 kW | Mar 9, 2026 |
|
MASS AUDUBON LONG PASTURE #1
Barnstable, MA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
ARREBOL VILLAS EV CHARGER 2
Goodyear, AZ
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
FOREST LAKE SER FOR SVR
Forest Lake, MN
Operational First tracked Mar 7, 2026 |
Operational | — | 12 kW | Mar 7, 2026 |
|
THS LEVIS
Perrysburg, OH
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE BS2 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 20 STATION1
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 6 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
MAIN PLACE 187
Orange, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 8 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 15 STAT
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
CITY OF SLO CAD
San Luis Obispo, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 1 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 1 STATION 2
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 24 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
HI HOPKINSVILLE HI EXPRESS
Oak Grove, KY
Operational First tracked Mar 6, 2026 |
Operational | — | 4 kW | Mar 6, 2026 |
|
HGICARTERSVILLE HGI
Cartersville, GA
Operational First tracked Mar 6, 2026 |
Operational | — | 7 kW | Mar 6, 2026 |
|
3V B2-29
Sunnyvale, CA
Operational First tracked Mar 6, 2026 |
Operational | — | 12 kW | Mar 6, 2026 |
|
TWENTY VALLEY CPF50
Lincoln, ON
Operational First tracked Mar 6, 2026 |
Operational | — | 8 kW | Mar 6, 2026 |