ChargePoint
B+30,364
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Covina, CA
7kW max
Glendale, CA
7kW max
Glendale, CA
7kW max
Glendora, CA
12kW max
Glendale, CA
7kW max
Glendale, CA
7kW max
Los Angeles, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Burbank, CA
7kW max
Long Beach, CA
7kW max
San Diego, CA
7kW max
Long Beach, CA
7kW max
Costa Mesa, CA
7kW max
Huntington Beach, CA
7kW max
Long Beach, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| COVINA EV PW YARD (Covina, CA) | — | 7 | 18 Jul | ||
| GLENDALE CC GARFIELD 1 (Glendale, CA) | — | 7 | 18 Jul | ||
| AAB RESIDENTIAL RESIDENTIAL (Glendale, CA) | — | 7 | 18 Jul | ||
| TOYOTA GLENDORA (Glendora, CA) | — | 12 | 18 Jul | ||
| LTG STATION 01 (Glendale, CA) | — | 7 | 18 Jul | ||
| GLENDALE CC GARFIELD (Glendale, CA) | — | 7 | 18 Jul | ||
| OCCIDENTAL SOLAR ARRAY 01 (Los Angeles, CA) | — | 7 | 18 Jul | ||
| BWP EV CHARGE 520 N GLENOAKS (Burbank, CA) | — | 7 | 18 Jul | ||
| AVION BURBANK 3013-DUO (Burbank, CA) | — | 7 | 18 Jul | ||
| BWP EV CHARGE MCCAMBRIDGE 2 (Burbank, CA) | — | 7 | 18 Jul | ||
| AVION BURBANK 3001 (Burbank, CA) | — | 7 | 18 Jul | ||
| AVION O8 3029-DUO (Burbank, CA) | — | 7 | 18 Jul | ||
| BWP EV CHARGE ONTARIO (Burbank, CA) | — | 7 | 18 Jul | ||
| BWP EV CHARGE 201 CORNELL DR (Burbank, CA) | — | 7 | 18 Jul | ||
| LONG BEACH SOLAR CHARGER 1 (Long Beach, CA) | — | 7 | 18 Jul | ||
| SAN JOSE ARC 337 (San Diego, CA) | — | 7 | 18 Jul | ||
| LONG BEACH SOLAR CHARGER 2 (Long Beach, CA) | — | 7 | 18 Jul | ||
| CCCD CCCD 1 (Costa Mesa, CA) | — | 7 | 18 Jul | ||
| WIND RIVER PARK STATION 1 (Huntington Beach, CA) | — | 7 | 18 Jul | ||
| CENTERCAL NORTH DECK EV 2 (Long Beach, CA) | — | 7 | 18 Jul |