Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
South San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
South San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
South San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
South San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Brisbane, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
South San Francisco, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Powell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Campbell River, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
THE SHORE THE SHORE 10
Brisbane, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
GENESIS EV PG&E EV 1
South San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE COVE EV 171 OYSTER
South San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PS 1 ALL PS1-6
South San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE SHORE THE SHORE
Brisbane, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE COVE EV 181 OYSTER
South San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CBRE8000 STATION
Brisbane, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CCSF-SFMTA JCG ANNEX 1
San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE SHORE THE SHORE
Brisbane, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE SHORE THE SHORE 11
Brisbane, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE COVE EV GL
South San Francisco, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BROADSTREET FOREST RIDGE
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BROADSTREET CV TOWER
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY OF CR CA CITY HALL 1
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CR TOYOTA CR TOYOTA
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY OF CR CA SPORTSPLEX 1
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
NORTH ISLAND CR CAMPUS
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PAC PT MARKT EV 1
Powell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY OF CR CA ROTARY PARK EV1
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BROADSTREET CV PHASE 4
Campbell River, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |