Seneca, SC
Average peak power unavailable
19 kW maximum
First tracked Sep 17, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Seneca, SC
Average peak power unavailable
19 kW maximum
First tracked Sep 17, 2026
Augusta, ME
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
Augusta, ME
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
Augusta, ME
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
Augusta, ME
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
Augusta, ME
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
San Diego, CA
Average peak power unavailable
63 kW maximum
First tracked Sep 16, 2026
S, NY
Average peak power unavailable
63 kW maximum
First tracked Sep 16, 2026
Ewing Township, NJ
Average peak power unavailable
63 kW maximum
First tracked Sep 16, 2026
Los Angeles, CA
Average peak power unavailable
19 kW maximum
First tracked Sep 16, 2026
Ewing Township, NJ
Average peak power unavailable
19 kW maximum
First tracked Sep 15, 2026
Chicago, IL
Average peak power unavailable
19 kW maximum
First tracked Sep 15, 2026
Chantilly, VA
Average peak power unavailable
19 kW maximum
First tracked Sep 15, 2026
Chantilly, VA
Average peak power unavailable
19 kW maximum
First tracked Sep 15, 2026
Huntsville, AL
62 kW avg peak
63 kW maximum
First tracked Sep 15, 2026
Seattle, WA
Average peak power unavailable
125 kW maximum
First tracked Sep 15, 2026
Ames, IA
Average peak power unavailable
80 kW maximum
First tracked Sep 15, 2026
Chantilly, VA
Average peak power unavailable
19 kW maximum
First tracked Sep 14, 2026
Robbinsdale, MN
Average peak power unavailable
63 kW maximum
First tracked Sep 14, 2026
Concord, MA
Average peak power unavailable
19 kW maximum
First tracked Sep 11, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
TREEHAUS EV TREEHAUS EV
Seneca, SC
Operational First tracked Sep 17, 2026 |
Operational | — | 19 kW | Sep 17, 2026 |
|
BGS CHMBLN L6 EVC 4
Augusta, ME
Operational First tracked Sep 16, 2026 |
Operational | — | 19 kW | Sep 16, 2026 |
|
BGS CHMBLN L6 EVC 5
Augusta, ME
Operational First tracked Sep 16, 2026 |
Operational | — | 19 kW | Sep 16, 2026 |
|
BGS CHMBLN L6 EVC 3
Augusta, ME
Operational First tracked Sep 16, 2026 |
Operational | — | 19 kW | Sep 16, 2026 |
|
BGS CHMBLN L6 EVC
Augusta, ME
Operational First tracked Sep 16, 2026 |
Operational | — | 19 kW | Sep 16, 2026 |
|
BGS CHMBLN L6 EVC
Augusta, ME
Operational First tracked Sep 16, 2026 |
Operational | — | 19 kW | Sep 16, 2026 |
|
OLD TOWN SD A0
San Diego, CA
Operational First tracked Sep 16, 2026 |
Operational | — | 63 kW | Sep 16, 2026 |
|
NYC FLEET DOEPETRDES_2_L3
S, NY
Operational First tracked Sep 16, 2026 |
Operational | — | 63 kW | Sep 16, 2026 |
|
NJDOT HQ DC
Ewing Township, NJ
Unknown First tracked Sep 16, 2026 |
Unknown | — | 63 kW | Sep 16, 2026 |
|
BUDDHA TAHL MAH SAH
Los Angeles, CA
Unknown First tracked Sep 16, 2026 |
Unknown | — | 19 kW | Sep 16, 2026 |
|
NJDOT
Ewing Township, NJ
Operational First tracked Sep 15, 2026 |
Operational | — | 19 kW | Sep 15, 2026 |
|
NRS 1 NRS_SOUTH_1
Chicago, IL
Operational First tracked Sep 15, 2026 |
Operational | — | 19 kW | Sep 15, 2026 |
|
FAIRFAX COUNTY SULLY GC 2
Chantilly, VA
Operational First tracked Sep 15, 2026 |
Operational | — | 19 kW | Sep 15, 2026 |
|
FAIRFAX COUNTY SULLY GC
Chantilly, VA
Operational First tracked Sep 15, 2026 |
Operational | — | 19 kW | Sep 15, 2026 |
|
MBHUNTSVILLE DC FAST CHARGER
Huntsville, AL Reliability A Operational First tracked Sep 15, 2026 |
Operational | 62 kW | 63 kW | Sep 15, 2026 |
|
CITY LIGHT N BEACON HILL
Seattle, WA
Operational First tracked Sep 15, 2026 |
Operational | — | 125 kW | Sep 15, 2026 |
|
AMES EV DC
Ames, IA
Operational First tracked Sep 15, 2026 |
Operational | — | 80 kW | Sep 15, 2026 |
|
FAIRFAX COUNTY SULLY GC
Chantilly, VA
Operational First tracked Sep 14, 2026 |
Operational | — | 19 kW | Sep 14, 2026 |
|
ROBBINSDALECITY CITY HALL
Robbinsdale, MN
Operational First tracked Sep 14, 2026 |
Operational | — | 63 kW | Sep 14, 2026 |
|
FIELD HOUSE STATION 1
Concord, MA
Operational First tracked Sep 11, 2026 |
Operational | — | 19 kW | Sep 11, 2026 |