Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Calabasas, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Torrance, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Merritt, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Merritt, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Merritt, BC
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Jose, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Jose, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Jose, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Milpitas, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
LONG BEACH CITY PLACE A 0
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
LONG BEACH ALAMITOS BCH 1
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
LONG BEACH JUNIPERO 1
Long Beach, CA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
LONG BEACH CT PLACE C 0
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PARK AND RIDE CALABASAS
Calabasas, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
TEACHER LOT FACULTY LOT
Los Angeles, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HRAL
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITYOFTORRANCE STATION
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
GANAHL LUMBER EV PUBLIC GL
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BEST PLAZA ST#1 CT4K
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
JOLLIBEE STATION 1
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITYOFTORRANCE STATION
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE ENCLAVE STATION
Torrance, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MR MIKES BWP
Merritt, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
NVIT NVIT 3
Merritt, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
NVIT NVIT
Merritt, BC
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
COUNTY SSA JULIAN
San Jose, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HANOVER COMPANY STATION 1
San Jose, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SANTA CLARA U. VILLA
San Jose, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
EV CHARGING MILPITAS EXT
Milpitas, CA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |