ChargePoint
B+30,241
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Bedford, MA
7kW max
Wellesley, MA
7kW max
Waltham, MA
7kW max
Carlisle, MA
7kW max
Wilmington, MA
7kW max
Andover, MA
7kW max
Tewksbury, MA
7kW max
Billerica, MA
63kW max
Wilmington, MA
7kW max
Billerica, MA
63kW max
Wilmington, MA
7kW max
Bedford, MA
7kW max
Billerica, MA
7kW max
Tewksbury, MA
7kW max
Tewksbury, MA
7kW max
Billerica, MA
7kW max
Tewksbury, MA
7kW max
Tewksbury, MA
7kW max
Tewksbury, MA
7kW max
Hopkinton, RI
151kW avg
63kW max
| Location | Status | Avg kW | Max kW | Added ↓ | |
|---|---|---|---|---|---|
| BEDFORD-EVS TOWN HALL '19 (Bedford, MA) | — | 7 | 18 Jul | ||
| MASSBAY STUDENT PARKING (Wellesley, MA) | — | 7 | 18 Jul | ||
| 404 (Waltham, MA) | — | 7 | 18 Jul | ||
| CARLISLE CPS (Carlisle, MA) | — | 7 | 18 Jul | ||
| 200 BOP BACK 1 (Wilmington, MA) | — | 7 | 18 Jul | ||
| 200 BOP BACK 2 (Andover, MA) | — | 7 | 18 Jul | ||
| INNOVATION DR BUILDING 400 (Tewksbury, MA) | — | 7 | 18 Jul | ||
| METTLER TOLEDO EV CHARGER #2 (Billerica, MA) | — | 63 | 18 Jul | ||
| 200 BOP FRONT (Wilmington, MA) | — | 7 | 18 Jul | ||
| METTLER TOLEDO EV CHARGER #1 (Billerica, MA) | — | 63 | 18 Jul | ||
| BGO US CORE 800 RESRCH EV (Wilmington, MA) | — | 7 | 18 Jul | ||
| BEDFORD-EVS LANE SCH 2024 (Bedford, MA) | — | 7 | 18 Jul | ||
| THE VAL (Billerica, MA) | — | 7 | 18 Jul | ||
| NATIONAL GRID 99 TEWKSBURY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| TEWKSBURY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| NATIONAL GRID BILLERICA 99 (Billerica, MA) | — | 7 | 18 Jul | ||
| TEWKSBURY TOWN HALL (Tewksbury, MA) | — | 7 | 18 Jul | ||
| TEWKSBURY LIBRARY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| INNOVATION DR BUILDING 200 (Tewksbury, MA) | — | 7 | 18 Jul | ||
| A | RI OER ASHAWAY (Hopkinton, RI) | 151 | 63 | 18 Jul |