Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Melrose, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Somerville, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Somerville, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Cambridge, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Lynnfield, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
North Reading, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
345 HARRISON EAST GATE 2
Boston, MA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P3
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
WINDSOROAKGROVE CHARGER
Melrose, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MCCA BOS COM GARAGE
Boston, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY OF BOSTON MUNI LOT 18
Boston, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
100 CLARENDON
Boston, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P4
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SPPLUS
Somerville, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMA EVS P
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ARE 325B ARE 325
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
50 HAMPSHIRE 50 HAMPSHIRE
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
GTI PROPERTIES STATION #2-RGT
Boston, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SOMERVILLE MA HIGH SCHOOL
Somerville, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MIT CAMPUS BLDG62 P1-8
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BOSTON PROP CC BPGREENGARAGE
Cambridge, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
RMLD SUMMER ST ELEM
Lynnfield, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CONCORD ST 55 CONCORD
North Reading, MA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |