Atlanta, GA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Atlanta, GA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Nashville, TN
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Hoffman Estates, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
South Beloit, IL
103 kW avg peak
160 kW maximum
First tracked Jul 19, 2024
South Beloit, IL
103 kW avg peak
160 kW maximum
First tracked Jul 19, 2024
McComb, MS
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Little Rock, AR
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Glendive, MT
Average peak power unavailable
19 kW maximum
First tracked Jul 19, 2024
Lakeside, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Lakeside, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Marina del Rey, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Culver City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 19, 2024
Halifax, NS
Average peak power unavailable
24 kW maximum
First tracked Jul 18, 2024
Halifax, NS
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Halifax, NS
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bedford, NS
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Windsor, NS
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Windsor, NS
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Kensington, PE
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
AXIS MIDTOWN S
Atlanta, GA
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
METRO 5TH&BROAD 5+B_RESI02_2
Nashville, TN
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
SBUX HOFFMAN B SBUX HB
Hoffman Estates, IL
Unknown First tracked Jul 19, 2024 |
Unknown | — | 7 kW | Jul 19, 2024 |
|
GPM INVESTMENTS 5156 DC
South Beloit, IL Reliability A Operational First tracked Jul 19, 2024 |
Operational | 103 kW | 160 kW | Jul 19, 2024 |
|
GPM INVESTMENTS 5156 DC
South Beloit, IL Reliability A Operational First tracked Jul 19, 2024 |
Operational | 103 kW | 160 kW | Jul 19, 2024 |
|
LOVE'S 393 - MS #393 L2
McComb, MS
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
OBE EMBASSY LITROC
Little Rock, AR
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
ACC-2 RGC SUR
Austin, TX
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
HKT BIG SKY CP6K LUBE BAY
Glendive, MT
Unknown First tracked Jul 19, 2024 |
Unknown | — | 19 kW | Jul 19, 2024 |
|
EL CAPITAN A0
Lakeside, CA
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
EL CAPITAN A03-A04
Lakeside, CA
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
GROUP 1 X67 STATION 1
Marina del Rey, CA
Operational First tracked Jul 19, 2024 |
Operational | — | 7 kW | Jul 19, 2024 |
|
CP COURTYARD STATION 01
Culver City, CA
Unknown First tracked Jul 19, 2024 |
Unknown | — | 7 kW | Jul 19, 2024 |
|
PRIVATEERS H-D CPE100
Halifax, NS
Unknown First tracked Jul 18, 2024 |
Unknown | — | 24 kW | Jul 18, 2024 |
|
RESTIER 634 PARKLAND DR
Halifax, NS
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
RESTIER 680 PARKLAND DR
Halifax, NS
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
DELLRIDGE STATION
Bedford, NS
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
WEST HANTS REGI WINDSOR CC
Windsor, NS
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
WEST HANTS REGI WH SPORTS COMP
Windsor, NS
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
TOWN KENSINGTON STATION 3
Kensington, PE
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |