San Luis Obispo, CA
Average peak power unavailable
19 kW maximum
First tracked Aug 3, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
San Luis Obispo, CA
Average peak power unavailable
19 kW maximum
First tracked Aug 3, 2024
Littleton, MA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Stowe, VT
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Dulles, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Chapel Hill, NC
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Winchester, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Winchester, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Douglasville, GA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Troy, AL
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Granite City, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Round Rock, TX
Average peak power unavailable
63 kW maximum
First tracked Aug 2, 2024
Hatch, NM
77 kW avg peak
63 kW maximum
First tracked Aug 2, 2024
Anthony, NM
Average peak power unavailable
63 kW maximum
First tracked Aug 2, 2024
Lindon, UT
71 kW avg peak
125 kW maximum
First tracked Aug 2, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Santa Monica, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
Kettleman City, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 2, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
LCI STATION
San Luis Obispo, CA
Operational First tracked Aug 3, 2024 |
Operational | — | 19 kW | Aug 3, 2024 |
|
LELD PLAYGROUND
Littleton, MA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
STOWE ELECTRIC REC PATH
Stowe, VT
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
NRUCFC-VEH CFC #3
Dulles, VA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
UNC GILES HORNEY
Chapel Hill, NC
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
WINCHESTER MED
Winchester, VA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
WINCHESTER MED SURGI-CENTER
Winchester, VA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
DOCTOR DOCTOR 2
Douglasville, GA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
TROY UTILITIES TROY 03
Troy, AL
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
NEON SIGN PARK NEON SIGN PARK
Granite City, IL
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
244 GRR-DCINVENTORY
Round Rock, TX
Operational First tracked Aug 2, 2024 |
Operational | — | 63 kW | Aug 2, 2024 |
|
DONA ANA HATCH EV 1
Hatch, NM Reliability C Operational First tracked Aug 2, 2024 |
Operational | 77 kW | 63 kW | Aug 2, 2024 |
|
DONA ANA ANTHONY EV1
Anthony, NM
Operational First tracked Aug 2, 2024 |
Operational | — | 63 kW | Aug 2, 2024 |
|
MURDOCK GENESIS SALES
Lindon, UT Reliability C Operational First tracked Aug 2, 2024 |
Operational | 71 kW | 125 kW | Aug 2, 2024 |
|
VOLT VOLT 3000
Burbank, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
VOLT VOLT 3020
Burbank, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
VOLT VOLT 3012
Burbank, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
VOLT VOLT 3010
Burbank, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
SANTA MONICA A JOSLYN PARK
Santa Monica, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |
|
RSUSD 701 GEN PETRO 2
Kettleman City, CA
Operational First tracked Aug 2, 2024 |
Operational | — | 7 kW | Aug 2, 2024 |