Oswego, NY
Average peak power unavailable
19 kW maximum
First tracked Aug 8, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Oswego, NY
Average peak power unavailable
19 kW maximum
First tracked Aug 8, 2024
enola, PA
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Enola, PA
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Winchester, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Troy, MI
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Chicago, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Greenwood, IN
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Nashville, TN
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Belvidere, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Madison, WI
Average peak power unavailable
24 kW maximum
First tracked Aug 8, 2024
St. Louis, MO
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Forest City, IA
151 kW avg peak
350 kW maximum
First tracked Aug 8, 2024
Forest City, IA
151 kW avg peak
350 kW maximum
First tracked Aug 8, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
Mansfield, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 8, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
SHINEMAN SOUTH SHINEMAN CNTR
Oswego, NY
Operational First tracked Aug 8, 2024 |
Operational | — | 19 kW | Aug 8, 2024 |
|
HAMPDEN STATION
enola, PA
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
HAMPDEN STATION
Enola, PA
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
WINCHESTER MED GARAGE 2
Winchester, VA
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
SOMERSETLEASING LIFESTYLE CTR
Troy, MI
Unknown First tracked Aug 8, 2024 |
Unknown | — | 7 kW | Aug 8, 2024 |
|
LBFE STATION 1
Chicago, IL
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
FSC CHARGING BUILDING 9
Greenwood, IN
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
RYE CHARLOTTE GARAGE FLOOR
Nashville, TN
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
DQ BELVIDERE 1 STATION 1
Belvidere, IL
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
OUTSIDE FCHARGE ABB FAST CHARGE
Madison, WI
Operational First tracked Aug 8, 2024 |
Operational | — | 24 kW | Aug 8, 2024 |
|
NESTLE PURINA. LOT 3A
St. Louis, MO
Unknown First tracked Aug 8, 2024 |
Unknown | — | 7 kW | Aug 8, 2024 |
|
WESTLAKE CAMPUS BP ST
Houston, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
WESTLAKE CAMPUS BP ST
Houston, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
WESTLAKE CAMPUS BP ST
Houston, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
PRITCHARDS
Forest City, IA Reliability A Operational First tracked Aug 8, 2024 |
Operational | 151 kW | 350 kW | Aug 8, 2024 |
|
PRITCHARDS CL2-POWERLINK
Forest City, IA Reliability A Operational First tracked Aug 8, 2024 |
Operational | 151 kW | 350 kW | Aug 8, 2024 |
|
WES-CARLISLE CARLISLE GAR 1
Austin, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
WES-CARLISLE CARLISLE GAR
Austin, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
WES-CARLISLE CARLISLE GAR
Austin, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |
|
CT4000 MANSFLD PUBLIC
Mansfield, TX
Operational First tracked Aug 8, 2024 |
Operational | — | 7 kW | Aug 8, 2024 |