24,388
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

TXB #5 STATION

Bonham, TX

Operational Reliability B

80 kW avg peak

125 kW maximum

First tracked Sep 6, 2024

GT LLC STATION

Denver, CO

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 6, 2024

UNM CTC 1

Albuquerque, NM

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 6, 2024

RDN RDN-PUBLIC_STAF

Nanaimo, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 6, 2024

NY STATE PARKS BAYARD SP

Great River, NY

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

YR HYI EVC 3

Markham, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

AVILLA_MYSTIC STATION 1

Peoria, AZ

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

CSU FULLERTON S10- 0

Fullerton, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

DAS OREGON OEDLOT-0

Salem, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

DAS OREGON YELLOWLOT-03

Salem, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 5, 2024

GUILLEVIN ON

Vaughan, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 4, 2024

UPMC PENN GARAGE

Pittsburgh, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 4, 2024

UPMC CROSSOVER

Pittsburgh, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 4, 2024

SOLSTICE 1 CHARGEPOINT

Orlando, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 4, 2024

WAUBONSEE CC WCCPLANO1

Plano, IL

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 4, 2024

STARKVILLE UTIL STATION

Starkville, MS

Operational Reliability B

87 kW avg peak

125 kW maximum

First tracked Sep 4, 2024

Page 403 of 1220

This action cannot be undone.