Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 17, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Oceanside, CA
Average peak power unavailable
7 kW maximum
First tracked Sep 17, 2024
Monrovia, CA
84 kW avg peak
125 kW maximum
First tracked Sep 17, 2024
Portland, OR
129 kW avg peak
350 kW maximum
First tracked Sep 17, 2024
Portland, OR
129 kW avg peak
350 kW maximum
First tracked Sep 17, 2024
Eugene, OR
Average peak power unavailable
12 kW maximum
First tracked Sep 17, 2024
Port Orchard, WA
Average peak power unavailable
7 kW maximum
First tracked Sep 17, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Sep 15, 2024
Franklin Township, NJ
Average peak power unavailable
10 kW maximum
First tracked Sep 14, 2024
Franklin Township, NJ
Average peak power unavailable
10 kW maximum
First tracked Sep 14, 2024
Netcong, NJ
Average peak power unavailable
7 kW maximum
First tracked Sep 14, 2024
Springfield, VA
Average peak power unavailable
7 kW maximum
First tracked Sep 14, 2024
Raleigh, NC
Average peak power unavailable
7 kW maximum
First tracked Sep 14, 2024
Montgomery, WV
Average peak power unavailable
7 kW maximum
First tracked Sep 14, 2024
Joplin, MO
87 kW avg peak
180 kW maximum
First tracked Sep 14, 2024
Scituate, MA
Average peak power unavailable
7 kW maximum
First tracked Sep 13, 2024
Boston, MA
61 kW avg peak
63 kW maximum
First tracked Sep 13, 2024
East Hartford, CT
Average peak power unavailable
19 kW maximum
First tracked Sep 13, 2024
Davidson, NC
Average peak power unavailable
7 kW maximum
First tracked Sep 13, 2024
Davidson, NC
Average peak power unavailable
7 kW maximum
First tracked Sep 13, 2024
Canal Winchester, OH
80 kW avg peak
350 kW maximum
First tracked Sep 13, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
MIRACOSTA EV OCN
Oceanside, CA
Operational First tracked Sep 17, 2024 |
Operational | — | 7 kW | Sep 17, 2024 |
|
MYRTLE CHEVRON STATION
Monrovia, CA Reliability D Operational First tracked Sep 17, 2024 |
Operational | 84 kW | 125 kW | Sep 17, 2024 |
|
PGE EEA
Portland, OR Reliability B Operational First tracked Sep 17, 2024 |
Operational | 129 kW | 350 kW | Sep 17, 2024 |
|
PGE EEA DCFC 3
Portland, OR Reliability B Operational First tracked Sep 17, 2024 |
Operational | 129 kW | 350 kW | Sep 17, 2024 |
|
WILD OAKS HOA
Eugene, OR
Operational First tracked Sep 17, 2024 |
Operational | — | 12 kW | Sep 17, 2024 |
|
WDVA THP
Port Orchard, WA
Operational First tracked Sep 17, 2024 |
Operational | — | 7 kW | Sep 17, 2024 |
|
UPMC HILLMAN GRG 2
Pittsburgh, PA
Operational First tracked Sep 15, 2024 |
Operational | — | 7 kW | Sep 15, 2024 |
|
AD SUTTON WHSE EV CHARGER
Franklin Township, NJ
Operational First tracked Sep 14, 2024 |
Operational | — | 10 kW | Sep 14, 2024 |
|
AD SUTTON WHSE EV CHARGER
Franklin Township, NJ
Operational First tracked Sep 14, 2024 |
Operational | — | 10 kW | Sep 14, 2024 |
|
POLOS BAR POLOS BAR
Netcong, NJ
Operational First tracked Sep 14, 2024 |
Operational | — | 7 kW | Sep 14, 2024 |
|
FAIRFAX COUNTY SPRING METRO
Springfield, VA
Operational First tracked Sep 14, 2024 |
Operational | — | 7 kW | Sep 14, 2024 |
|
PLATFORM1 STATION4
Raleigh, NC
Operational First tracked Sep 14, 2024 |
Operational | — | 7 kW | Sep 14, 2024 |
|
COMWV MONT COMM CTR
Montgomery, WV
Operational First tracked Sep 14, 2024 |
Operational | — | 7 kW | Sep 14, 2024 |
|
LIBERTY EMPIRE JOPLIN DTN ABB
Joplin, MO Reliability F Operational First tracked Sep 14, 2024 |
Operational | 87 kW | 180 kW | Sep 14, 2024 |
|
TOWN HALL HIGH SCHOOL
Scituate, MA
Operational First tracked Sep 13, 2024 |
Operational | — | 7 kW | Sep 13, 2024 |
|
400 SUMMER ST P3-2
Boston, MA Reliability D Operational First tracked Sep 13, 2024 |
Operational | 61 kW | 63 kW | Sep 13, 2024 |
|
HFORD DUAL
East Hartford, CT
Operational First tracked Sep 13, 2024 |
Operational | — | 19 kW | Sep 13, 2024 |
|
TRANETECHNOLOGI BLDG B FAR RIGH
Davidson, NC
Operational First tracked Sep 13, 2024 |
Operational | — | 7 kW | Sep 13, 2024 |
|
TRANETECHNOLOGI BLDG B
Davidson, NC
Operational First tracked Sep 13, 2024 |
Operational | — | 7 kW | Sep 13, 2024 |
|
JEFF WYLER EXPR PLUS PL
Canal Winchester, OH Reliability A Operational First tracked Sep 13, 2024 |
Operational | 80 kW | 350 kW | Sep 13, 2024 |