Batavia, OH
134 kW avg peak
350 kW maximum
First tracked Oct 9, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Batavia, OH
134 kW avg peak
350 kW maximum
First tracked Oct 9, 2024
Montgomery, AL
Average peak power unavailable
125 kW maximum
First tracked Oct 9, 2024
Montgomery, AL
Average peak power unavailable
125 kW maximum
First tracked Oct 9, 2024
Topeka, KS
Average peak power unavailable
7 kW maximum
First tracked Oct 9, 2024
Okotoks, AB
Average peak power unavailable
8 kW maximum
First tracked Oct 9, 2024
Santa Clarita, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 9, 2024
Salem, OR
85 kW avg peak
350 kW maximum
First tracked Oct 9, 2024
Portsmouth, NH
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Portsmouth, NH
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Essex Junction, VT
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
West Palm Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Campton Hills, IL
Average peak power unavailable
10 kW maximum
First tracked Oct 8, 2024
Kimberly, WI
Average peak power unavailable
19 kW maximum
First tracked Oct 8, 2024
Fort Collins, CO
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
Vancouver, WA
Average peak power unavailable
19 kW maximum
First tracked Oct 8, 2024
Half Moon Bay, CA
Average peak power unavailable
7 kW maximum
First tracked Oct 8, 2024
San Rafael, CA
Average peak power unavailable
10 kW maximum
First tracked Oct 8, 2024
Shreveport, LA
Average peak power unavailable
7 kW maximum
First tracked Oct 6, 2024
Philadelphia, PA
Average peak power unavailable
12 kW maximum
First tracked Oct 5, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
JEFF WYLER E
Batavia, OH Reliability C Operational First tracked Oct 9, 2024 |
Operational | 134 kW | 350 kW | Oct 9, 2024 |
|
WCM WCM-PKG LOT 02
Montgomery, AL
Operational First tracked Oct 9, 2024 |
Operational | — | 125 kW | Oct 9, 2024 |
|
WCM WCM-PKG LOT 01
Montgomery, AL
Unknown First tracked Oct 9, 2024 |
Unknown | — | 125 kW | Oct 9, 2024 |
|
RES OF AH CHARG AUBURNHILLSCHG2
Topeka, KS
Operational First tracked Oct 9, 2024 |
Operational | — | 7 kW | Oct 9, 2024 |
|
TOWN OF OKOTOKS NORTH RAILWAY
Okotoks, AB
Operational First tracked Oct 9, 2024 |
Operational | — | 8 kW | Oct 9, 2024 |
|
STARBUCKS STORE #5498
Santa Clarita, CA
Operational First tracked Oct 9, 2024 |
Operational | — | 7 kW | Oct 9, 2024 |
|
SKYLINE FORD
Salem, OR Reliability A Operational First tracked Oct 9, 2024 |
Operational | 85 kW | 350 kW | Oct 9, 2024 |
|
PRH-2401 PRH
Portsmouth, NH
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
PRH-2401 PRH#1
Portsmouth, NH
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
ESSEX JUNCTION RAILROAD ST
Essex Junction, VT
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
MORSE LIFE THE PALACE
West Palm Beach, FL
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
KANE COUNTY KANE KDOT
Campton Hills, IL
Operational First tracked Oct 8, 2024 |
Operational | — | 10 kW | Oct 8, 2024 |
|
FEST FOODS KIMBERLY
Kimberly, WI
Operational First tracked Oct 8, 2024 |
Operational | — | 19 kW | Oct 8, 2024 |
|
MERIT ELCTRIC FC EV 1
Fort Collins, CO
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
LINC SQUARE EXP LSS P3 248-249
Bellevue, WA
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
CPU CPU EC
Vancouver, WA
Operational First tracked Oct 8, 2024 |
Operational | — | 19 kW | Oct 8, 2024 |
|
HMB HMB-CORREAS ST2
Half Moon Bay, CA
Operational First tracked Oct 8, 2024 |
Operational | — | 7 kW | Oct 8, 2024 |
|
CITYOFSANRAFAEL C-ST GARAGE
San Rafael, CA
Operational First tracked Oct 8, 2024 |
Operational | — | 10 kW | Oct 8, 2024 |
|
SIGNATURE AVIAT SIGNATURE AVIAT
Shreveport, LA
Unknown First tracked Oct 6, 2024 |
Unknown | — | 7 kW | Oct 6, 2024 |
|
THE DARIEN DARIEN
Philadelphia, PA
Operational First tracked Oct 5, 2024 |
Operational | — | 12 kW | Oct 5, 2024 |